From
Date
Subject
Image
PLM
09-28-07
Adhesive Anchors
CPB
08-07-06
Sidewalks on Bridges
12-01-05
Elastomeric Bearing Design Guidelines & Analysis Program
11-29-05
State of Arkansas Insert on Bridges
11-16-05
Clip Detail to Accommodate Deck Form Support
RLW
08-23-05
Bicycle and Pedestrian Facility Accommodation Policy
03-23-05
Median Rail at Overhead Sign Support
03-21-05
Geometric Design Criteria
10-28-04
Design Exception Policy
07-23-04
Naming of Design Files
JGT
10-09-03
Revising Contract Drawings
09-05-03
Slab Joint Detail
07-22-03
Bridge End Terminals
05-22-03
Bridge Closure Procedure
04-02-03
Base Plates for Safety Cable System - Steel and Prestressed Precast Beams
ETF
04-18-02
Detail Z - Hand Packing of Concrete Under Joint Armor
Detail B - Hand Packing of Concrete Under Joint Armor
02-15-02
Type "D" Bridge Name Plate On Bridge Parapet
12-17-01
Bolted Field Splice Note
09-19-01
Charpy V-Notch Test of Curved Girder Diaphragms/Crossframes
09-17-01
Use of Type D Bridge Name Plate
FHWA
06-28-01
A Policy on Geometric Design of Highways and Streets (Green Book), 2001 Edition
MEC
06-21-01
1-1/4" Diameter A307 Bolts for Precast Units
05-21-01
Revised Sliding Plate Adjusting Bolts Note
Image 1
04-27-01
Minimum Cap Width for Trestle Pile Bents
02-28-01
Joint Armor Venting and Installation
Image 1; 2
02-14-01
Furnishing Bridge Information to Environmental Division
02-13-01
Bearing Stiffener Weld Designation
Information about Pipe Piles
06-26-00
Cracked Pile Repair - Example
06-13-00
Creating and Revising Standard Drawings
Skewed End Bents with Parapet Rail Transitions on Bridge
02-04-00
Diaphragm and Cross-Frame Connection Plates for Steel Beams and Girders
11-01-99
Deck Pouring Sequence; 3 or More Spans - Example
Reports Containing Geologic Interpretation and Analysis
02-12-99
Ice/Snow/Sleet Removal; Railroad Overpass Structures
01-19-99
Stopping Sight Distance
Image 1; 2; 3; 4; 5; 6; 7; 8; 9
12-03-98
Elastomeric Shop Drawing Review
DFL
06-26-98
Painted Median Width; 11-Foot Turn Lane
04-13-98
Deck Pouring Sequence; 2 Spans - Example
10-30-97
Vertical Clearance on Interstate Routes
Image 1; 2; 3; 4; 5
10-31-97
Concrete Deck Longitudinal Rebar Requirements by LRFD
BB
10-15-97
SP for Construction in Special Flood Hazard Areas (SFHA)
08-06-97
Request for Bridge Drawings - Revised
07-31-97
Geometric Design Criteria (AASHTO Specs)
06-27-97
Note for Stream Classif & Bank Elevs; Tempo Work Ramps or Haul Roads
10-17-96
Detailing & Designing for Permanent Steel Deck Forms
Image 1; 2; 3; 4
09-27-96
Dead Load Deflections; Beams at Variable Dist from Profile Grade Line
08-23-96
Curved Beam; Dead Load Deflection Spot Note
08-20-96
Sliding Plate Joint Detailing
08-09-96
AHTD 1996 STD Specs; Sect 800
07-22-96
Width of Slab Joint and Construction Joint
04-26-96
Construction Problem Resolution Process for Consultant Designed Jobs
ALH
04-08-96
Bridge Deck Pouring Sequences
DKC
04-05-96
Control Detail Sheets; Baselines &Survey Control Points
04-04-96
Criteria for Metric/English Unit Jobs
03-22-96
Design of Elastomeric Expansion Bearings
MES
03-04-96
Plate Girder Splice Elimination by Fabricators
02-21-96
Design Drawings and General Notes
02-12-96
Standard Drawings on CADD/OPT
02-09-96
Concrete Pours for Continuous Superstructure Units
Requests for Bridge Drawings
JAS
02-08-96
Drawing Changes Due To Value Engineering
12-20-95
Construction in Special Flood Hazard Areas (SFHA)
JB
11-17-95
Rapid Set Cement
JG
09-06-95
Safety Handrail - A513 Splice Coupler
GVL
07-26-95
Sealing Concrete Deck Cracks
05-02-95
Vertical Clearance for Bridges Over Highways
05-01-95
Designation of Metric Plans
PCA
04-17-95
Review of Prestressed Bridges Details
Image 1; 2; 3
04-05-95
Metric Process Update
04-04-95
Bridge Numbers
02-16-95
Shop Drawings For Elastomeric Bearings (Method B)
012-09-94
Horizontal Clearance For Underpasses Without Pier Protection Devices
011-23-94
Design of Elastomeric Bearings
08-25-94
Type H Railing Splice Tube
06-13-94
Guidelines for Founding Footings In Rock
06-08-94
Bridge Railing; Plate Guard Rail on Existing Bridges
05-10-94
Elastomeric Bridge Bearings
04-13-94
Bridge Deck Pouring Sequences for Continuous Units
04-12-94
Piling for Temporary Bridge Structures
03-04-94
Stormwater Pollution Prevention Plan - Division Involvement
01-18-94
Preliminary Seal on Bridge Drawings
10-20-93
Dead Load Deflection Note on Plans
09-24-93
Fast Setting Cement
07-16-93
Anchor System for U2 Joint Armor in Backwalls
XXX
07-08-93
Strutting System for Transverse Finishing Machine
05-03-93
Pavement Markings; High/Low Volume Road
VP
04-28-93
Transitional Approach Railing; Sidewalks in Urban Areas
03-16-93
Detour Bridges; Timber Decks
01-05-93
Pile Design Capacity; ENR/WEAP/Dynamic Method
12-23-92
Concrete Parapet Bridge Rail; Post/Slot Width
WET
11-25-92
Bridge Cap Construction; Drip Groove
10-22-92
09-30-92
Policy on Pouring Continuous Units
09-02-92
Backfill on Piers in Stream Bed
FMH
08-27-92
Vent Holes in Roadway Channels
08-26-92
Use of Precast Concrete Spans in Seismic Zones
06-10-92
Preformed Joint Seals; Bumper Blocks
05-28-92
Closed Cell Joint Filler
04-27-92
Dead Load Deflections for Reinforced Slab Concrete Spans
04-13-92
Closed Cell Joints; Epoxy Adhesive
04-07-92
Structure Inventory and Appraisal Item 113: Scour Critical
03-25-92
RCDG Spans - Forming Standardization
03-23-92
Painting Plates Above Drainage Slots
03-20-92
Design of Bolted Splices on Continuous Steel Girders
03-04-92
RCD Girders Versus Slabs
01-30-92
Steel H-Pile Driving Points:QPL
RR
11-18-91
Union Pacific Railroad Clearance Criteria
09-05-91
Exterior Diaphragm Connections for Continuous W-Beams
08-23-91
Crack Control Joints; Tension Rebar Over Supports
08-12-91
Concrete Pile Splice
07-30-91
Slab Reinforcing Steel
07-24-91
Approach Slab and Gutter Standards
06-20-91
Use of Approach Slabs In Seismic Design
06-03-91
Painting Structural Steel; Paint System Type
05-02-91
Major Overloads on Continuous Spans
05-01-91
Lateral Bracing For Plate Girders
04-16-91
Design Specification Changes; Comparative Design
02-13-91
Seismic Performance Category
02-07-91
Prestressing Strand Supports
01-29-91
Concrete Parapet Rail; Slip Forming Details
01-17-91
Seismic Design Implementation; Deactivate Task Force
11-13-90
Field Trip to F-S Prestress Plant; Hampton, Ark.
FHA
10-16-90
AASHTO Roadside Design Guide/W-Beam Guardrail End Terminals
10-05-90
Bridge Replacement Funded Projects; Eligibility Exceptions
09-28-90
Remodeling Bridge: Epoxy Rebar; Expansion Device
MS
09-11-90
Public Access Provisions at Bridge Projects; Game & Fish Commission
CEV
07-16-90
Verification of Survey/Plan Data
07-11-90
Epoxy Coated Reinforcing Steel
06-14-90
Safety Platform Special Provision
05-01-90
Detour Bridge Widths
04-04-90
Bridge Layout for FHWA Submittal
02-14-90
Intermediate Stiffeners
01-03-90
Updating Sets of Bridge Layout Drawings
12-22-89
Anchor Bolt/Diaphragm Connection Plate Interference
10-05-89
Bridge Replacement Funded Projects; Change in Eligibility
06-14-89
Environmental "Project Design Request"; Form Submittal
04-27-89
AWS Structural Welding Code; Acceptable Welds
04-10-89
Reinforcing Steel; Trussed Rebars;Epoxy Coated Bars
DAL
04-04-89
Rehabilitation of Bridges with Pin and Hangar Assemblies
01-26-89
Sidewalk Curb; Type C Curb
01-10-89
Bridge Painting - Protection of the Environment; Notification for Cleaning/Repainting or Field Painting
12-07-88
Railroad Clearances; FHPM 6.6.2.1
Prestressing Strands - Development Length Revisited
11-08-88
Steel Changes; Notification of Changes in Plan Quantities
09-26-88
Concrete Quantity Calculations; Embedded Structural Steel
07-26-88
Cleaning and Painting Existing Structural Steel; Notification to Environmental Division
07-14-88
Prestressed Concrete Girders; Alternate Design
07-08-88
Prestressing Strand - Development Length
05-05-88
Shop Prints for Compression Seal Expansion Joints; Bumper Plate/Seal Stop
03-17-88
Seals for Construction and Crack Control Joints
03-04-88
Hydraulic Criteria; Bridge Deck Elevation; Roadway Elevation
12-01-87
Removal of Existing Bridges; Quantity Sheet
MCP
10-23-87
Overhang Forming; Resident Engineer Review
XX
10-05-87
Rolled Beams and Plate Girders; Charpy V-Notch;QC
09-25-87
Epoxy Coated Reinforcing Steel; Bridge Decks
09-14-87
Approval of Structural Steel Shop Drawings; Transmittal Form
09-04-87
Minimum Angle for Preformed Joint Seal
09-02-87
Temporary Bridge Structure; Required Length
Remodeling Existing Bridge Structures; Sawed Cut Lines
08-24-87
Slab Joints; Poured Synthetic Polymer Joint Width
008-20-87
Concrete Pour
BKC
08-10-87
AHTD Detour Design Criteria
06-26-87
Spray Painting of Concrete Surfaces
06-04-87
Contracting for Engineering and Design Services; Brooks Act
04-30-87
Removal of Existing Bridge and Remodeling of Existing Bridge
BN
04-29-87
Design of Urban Roadway and Bridge Sections; Curbs, Sidewalks, Gutters Width
04-13-87
Precast Concrete Bridges; Nomenclature
03-02-87
Bridge Width in Urban Areas; Curbed Sections; Sidewalks
02-05-87
Preliminary and Construction Engineering; 15% Rate
02-02-87
Stiffeners at Cross Frame Locations
RH
01-14-87
Structural Steel Shop Drawings; Half-Size Prints
09-24-86
Cracked Concrete; Pressure Grouting
09-10-86
Paint Colors; Aluminum Color
CV
09-09-86
Bridge Replacement Preliminary Engineering
08-26-86
U2 Joints; Slots for Joints
Easements for Channel Work and Detour Bridges
03-31-86
Sidewalks; Appropriate Use
03-27-86
Design Speed on Federal Aid Projects; Design Data Form
02-05-86
Temporary Construction Easements
01-13-86
Anchor Bolt and Bearing Pad Remodeling Policy
12-31-85
Remodeling of Anchor Bolts and Bearings
12-20-85
Steel Beam Haunch Detail
12-13-85
Slab Camber; RC Slabs
DF
12-09-85
Salvage Credit for Materials Obtained on Federal-aid Projects
12-02-85
Railroad Agreements
11-08-85
Slab Span Bridge; Corner Rounding; Creep
RW
10-18-85
Design Flows for Detour Roads; 2-Year Frequency
09-25-85
Temporary Bridges; Timber Decks
08-27-85
Open Parapet Rails
08-26-85
Navigation Lights
FH
07-24-85
Steel H-Pile Points
07-03-85
Temporary Bridge Structures - Ends of Railing
06-06-85
Deck Thickness Tolerances
05-22-85
Detailing for Overhand Loading; Design Drawings
03-25-85
Bridge Deck Rehabilitation
03-07-85
Standard Policy Regarding Bridge Deck Overlay or Replacement
01-17-85
Maintenance of Traffic; Approval from Traffic Division
01-09-85
12-06-84
Overhang Brackets; Drawing Approval
11-08-84
Detour Bridges; Superate Computer Program
10-11-84
Test Pile Lengths; Concrete Piles
10-08-84
Live Load for Bridges; HS20
10-02-84
Checking Overhang Brackets
06-26-84
Tine Finish of Bridge Decks
NP
04-17-84
Crowned Caps on Concrete Slab Bridges
03-05-84
Detour Bridge; Untreated Timber
10-28-83
Minimum Dimensions for Single Column Bents
09-22-83
Elevations on Bridge Plans
07-13-83
Emergency Relief State Aid Projects; Design Exception
07-05-83
Reinforcing Steel Cover on Slab Span Bridges
06-30-83
Preformed Compression Seals
06-16-83
Butt-Welded Splices; Thickness Transition
04-22-83
Hydraulics Design - County Bridges
04-13-83
Bridge Loadings Design; HS20
02-15-83
Bridges on County Road System; Design Live Load
01-12-83
Straight Versus Galloping Bars for Bridge Decks
AFCO
11-30-82
Standard Washers
11-22-82
Coping Bearing Stiffeners
11-17-82
Blocking of Expansion Joint Devices
10-25-82
Approval Stamps
09-22-82
Precast Concrete Bridges on State Highways
06-24-82
Acceptable Butt Welds
05-13-82
Review of Shop Drawings
03-01-82
Linseed Oil Application
07-21-81
Evaluation of Structural Concrete when Test Cylinders Break Low; Equitable Price Adjustment
FMHX
03-11-80
Maximum Practical Size of Elastomeric Bearings
03-10-80
Web Stiffener Details
02-07-80
Retaining Wall Joints
02-22-79
Design of Splices - Both Plates and Hi-Strength Bolts
01-25-79
Vertical Rebar Requirements in Backwalls
12-12-78
Fabrication of Members; Direction of Rolling
03-10-78
Minimum Numbers of Bolts in Field Splices
10-27-76
Procedure for Distribution of Revised Drawings for Jobs Under Contract
09-28-76
Live Load Deflection; Steel Beam Spans
06-25-75
Use of Drop Hammers with Steel Piling
01-24-75
Vertical Stream Clearances; Hydraulics Policy
AC
11-27-74
Plate Guard Bridge Railing; Minute Order 74-644
07-31-74
Concrete Design Policy; Rebars Splices; Column Slenderness; Column Ties
08-23-73
Revision of Reinforcing Bar Bend Standards
08-08-73
Bridge Railing - 1973 AASHO Specs
02-08-73
Changes in AASHO Specs; Bolt Holes
12-19-72
Round Ties
12-06-72
Standard 45' Precast Slab Span
08-17-72
Sign-out Book in Reproduction
02-22-72
Embankment Slopes at Bridge Ends
12-02-71
Efficiency in Plan Preparation
11-17-71
Excavation for Structures; SP
11-05-71
Office Policy on Design Items: Cover Plate Sizes; Modular Ratio
09-28-71
Changes in Detailing Practice; Reinforcing Steel in Pile Bent Caps
09-17-71
Uniformity of Bridge Plans; Sequence of Plan Sheets
09-01-71
Repetition of Design and Special Drawings
08-09-71
Revision of Standard Guard Rail Drawings
08-06-71
Hydraulics Information on Bridge Layouts
08-04-71
Steel Pile Driving; General Note
07-09-71
Guard Fence Anchor Posts
06-25-71
Crack Control Joint
05-26-71
Welded Plate Girder Spans; General Note
04-21-71
Microfilm Cards for Bridge Drawings
04-08-71
Changes In Design From 1971 AASHO Interim Specs; Fatigue; Continuous P/S Structures; Bolted Splices; Load Factor Design
04-07-71
General Office Procedures Cross-Slope; Drain Slots
RS
03-19-71
Design Policy on Long Pile Bents
01-27-71
Expansion Joint for RC Slab Spans
01-26-71
Bridge Site Inspections; Sample Bridge Layout Memo
Type Shoes; Beam Buildups; Plate Thickening
04-03-69
Detailing of Reinforcing Steel; Bar Ends; Bar Designation
LPC
06-02-66
Structural Steel Costs
No Date
Future Jobs
Design Notes on Welded Girders
Copyright © 2020 ARDOT Privacy Notice of Nondiscrimination ¦ Freedom of Information