NOTICE TO BIDDERS |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
The Arkansas State Highway and Transportation Department will
receive sealed bids for the following items,until time and date specified, at
which time they will be publicly opened and read. Bids must be
submitted on AHTD forms and can be obtained by clicking on the desired Bid
Number or by calling (501) 569-2667.
If you elect to download bid information from this site, remember to
check back prior to your bid opening date for any updates (Addendums) to your
bid information. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
If you need help
with this page click here -----> |
Help |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Bid No. |
Tab |
Mowing |
Opening Date |
Description |
Buyer |
Awarded |
|
|
|
|
|
|
|
H-15-314R |
Tab |
|
Jun 16, 2015 |
Lowboy Trailer, Double Drop, Tri-Axle with Detachable
Gooseneck |
KR |
7/6/2015 |
|
|
|
|
|
|
|
|
|
|
|
FOB: Little Rock, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-15-313R |
Tab |
|
Jun 2, 2015 |
Road Sweeper |
KR |
6/24/2015 |
|
|
|
|
|
|
|
ADDENDUM |
|
|
|
FOB: Little Rock, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-15-312R |
Tab |
|
Jun 2, 2015 |
Snow Plow |
KR |
6/15/2015 |
|
|
|
|
|
|
|
|
|
|
|
FOB: Pine Bluff,
Camden, Harrison and Paragould, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-15-060R |
Tab |
|
May 27, 2015 |
Truck Mounted Under Bridge Inspection Unit, 75', Vertical
Reach, |
KR |
6/5/2015 |
|
|
|
|
|
|
|
|
|
|
|
Flat Bed Body |
|
|
|
|
|
|
|
|
|
|
|
|
|
FOB: Little Rock, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-15-311R |
Tab |
|
May 27, 2015 |
Tandem Axle Equipment Trailer, 20 Ton with Folding Ramps |
KR |
6/16/2015 |
|
|
|
|
|
|
|
ADDENDUM |
|
|
|
FOB: Russellville, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-15-310R |
Tab |
|
May 27, 2015 |
Crawler Tractor, with Hydraulic Controlled Angle Dozer,
Diesel, 90 HP |
KR |
6/17/2015 |
|
|
|
|
|
|
|
|
|
|
|
FOB: Russellville, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-15-309R |
Tab |
|
May 27, 2015 |
Compact Hydraulic Excavator |
KR |
6/19/2015 |
|
|
|
|
|
|
|
|
|
|
|
FOB: Camden, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-15-308R |
Tab |
|
May 27, 2015 |
Cab & Chassis |
KR |
6/26/2015 |
|
|
|
|
|
|
|
|
|
|
|
FOB: Little Rock, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-15-059P |
Tab |
|
May 12, 2015 |
Stream Mitigation Credits |
CP |
|
|
|
|
|
|
|
|
|
|
|
|
FOB: Benton County |
|
|
|
|
|
|
|
|
|
|
|
|
|
(Job #CA0904) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-15-058P |
Tab |
|
Apr 28, 2015 |
3 Items - Aluminum Blanks |
CP |
|
|
|
|
|
|
|
|
|
|
|
|
FOB: Little Rock, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-15-057P |
Tab |
|
Apr 28, 2015 |
8 Items - Aluminum Sign Blanks |
CP |
5/5/2015 |
|
|
|
|
|
|
|
|
|
|
|
FOB: Little Rock, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-15-056P |
Tab |
|
Apr 28, 2015 |
12 Items - Aluminum Sign Blanks |
CP |
5/5/2015 |
|
|
|
|
|
|
|
|
|
|
|
FOB: Little Rock, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-15-055J |
Tab |
|
Apr 28, 2015 |
13 Items - Mineral Aggregate Class 4 |
JO |
5/5/2015 |
|
|
|
|
|
|
|
|
|
|
|
FOB: Drew (2),
Jefferson (2), Desha (2), |
|
|
|
|
|
|
|
|
|
|
|
|
|
Chicot, Ashley, Lincoln, Grant & |
|
|
|
|
|
|
|
|
|
|
|
|
|
Arkansas (3) Co. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-15-054J |
Tab |
|
Apr 28, 2015 |
2 items - Mineral Aggregate Class 2 |
JO |
5/5/2015 |
|
|
|
|
|
|
|
|
|
|
|
FOB: Madison &
Newton Co. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-15-307R |
Tab |
|
Apr 28, 2015 |
Cab & Chassis |
KR |
Rejected |
|
|
|
|
|
|
|
|
|
|
|
FOB: Little Rock, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-15-053J |
Tab |
|
Apr 28, 2015 |
8 items - Mineral Aggregate Class 2 |
JO |
5/5/2015 |
|
|
|
|
|
|
|
|
|
|
|
FOB: Hot Spring,
Saline(2), Lonoke(3) & |
|
|
|
|
|
|
|
|
|
|
|
|
|
Prairie(2) Co. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-15-052P |
Tab |
|
Apr 21, 2015 |
Stream Mitigation Credits |
CP |
5/5/2015 |
|
|
|
|
|
|
|
|
|
|
|
FOB: Carroll County |
|
|
|
|
|
|
|
|
|
|
|
|
|
(Job #090330) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-15-051P |
Tab |
|
Apr 21, 2015 |
Sale of Salvage and Used Tires |
CP |
|
|
|
|
|
|
|
|
|
|
|
|
FOB: Harrison, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-15-302R |
Tab |
|
Apr 21, 2015 |
Loader, Pneumatic Tire |
KR |
5/11/2015 |
|
|
|
|
|
|
|
ADDENDUM |
|
|
|
FOB: Pine Bluff, AR |
|
|
|
|
|
|
|
|
|
ADDENDUM(2) |
|
|
|
|
|
|
|
|
|
|
|
|
|
H-15-301R |
Tab |
|
Apr 21, 2015 |
Motor Grader |
KR |
5/14/2015 |
|
|
|
|
|
|
|
ADDENDUM |
|
|
|
FOB: Camden &
Russellville, AR |
|
|
|
|
|
|
|
|
|
ADDENDUM(2) |
|
|
|
|
|
|
|
|
|
|
|
|
|
H-15-306R |
Tab |
Mowing |
Apr 15, 2015 |
Benton County |
KR |
5/11/2015 |
|
|
|
|
|
|
|
Specifications |
|
|
|
Job No. 9-520 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-15-305R |
Tab |
Mowing |
Apr 15, 2015 |
Perry, Conway & Van Buren Counties |
KR |
5/1/2015 |
|
|
|
|
|
|
|
Specifications |
|
|
|
Job No. 8-577 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-15-304R |
Tab |
Mowing |
Apr 15, 2015 |
Pulaski County |
KR |
5/1/2015 |
|
|
|
|
|
|
|
Specifications |
|
|
|
Job No. 6-563 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-15-303R |
Tab |
Mowing |
Apr 15, 2015 |
Washington & Crawford Counties |
KR |
5/15/2015 |
|
|
|
|
|
|
|
Specifications |
|
|
|
Job No. 4-765 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-15-300R |
Tab |
|
Apr 14, 2015 |
Skid Steer Loader |
KR |
5/11/2015 |
|
|
|
|
|
|
|
|
|
|
|
FOB: Pine Bluff and
Little Rock, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-15-299R |
Tab |
|
Apr 14, 2015 |
Compact Track Loader |
KR |
4/23/2015 |
|
|
|
|
|
|
|
|
|
|
|
FOB: Barling, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
RFP-15-004P |
|
|
May 13, 2015 |
Mainline Weigh In Motion Equipment |
CP |
|
|
|
|
|
|
|
|
|
|
|
1:00 p.m. |
Installation and Integration with Mainline |
|
|
|
|
|
|
|
|
|
|
|
|
|
and Ramp Screening Systems |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
RFP-15-005P |
|
|
Apr 15, 2015 |
Investment Management Firm Services |
CP |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-15-050J |
Tab |
|
Apr 7, 2015 |
13 Items - Mineral Aggregate Class 4 |
JO |
Reject & |
|
|
|
|
|
|
|
|
|
|
|
FOB: Drew (2),
Jefferson (2), Desha (2), |
|
Re-advertise |
|
|
|
|
|
|
|
|
|
|
|
Chicot, Ashley, Lincoln, Grant & |
|
|
|
|
|
|
|
|
|
|
|
|
|
Arkansas (3) Co. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-15-049P |
|
|
Mar 31, 2015 |
ICOM UT-126H Digital |
CP |
|
|
|
|
|
|
|
|
Addendum |
|
|
|
Modulator/Demodulator Unit |
|
|
|
|
|
|
|
|
|
|
|
|
|
FOB: Little Rock, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-15-298R |
Tab |
|
Mar 31, 2015 |
Cab & Chassis |
KR |
4/27/2015 |
|
|
|
|
|
|
|
|
|
|
|
FOB: Little Rock &
Harrison, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-15-297R |
Tab |
Mowing |
Mar 25, 2015 |
Randolph County |
KR |
4/15/2015 |
|
|
|
|
|
|
|
Specifications |
|
|
|
Job No. 10-628 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-15-296R |
Tab |
Mowing |
Mar 25, 2015 |
Lawrence, Greene & Craighead Counties |
KR |
5/7/2015 |
|
|
|
|
|
|
|
Specifications |
|
|
|
Job No. 10-627 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-15-295R |
Tab |
Mowing |
Mar 25, 2015 |
Mississippi, Craighead & Poinsett Counties |
KR |
5/7/2015 |
|
|
|
|
|
|
|
Specifications |
|
|
|
Job No. 10-626 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-15-294R |
Tab |
Mowing |
Mar 25, 2015 |
Greene & Craighead Counties |
KR |
5/7/2015 |
|
|
|
|
|
|
|
Specifications |
|
|
|
Job No. 10-625 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-15-293R |
Tab |
Mowing |
Mar 25, 2015 |
Clay County |
KR |
4/15/2015 |
|
|
|
|
|
|
|
Specifications |
|
|
|
Job No. 10-624 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-15-292R |
Tab |
Mowing |
Mar 25, 2015 |
Craighead & Mississippi Counties |
KR |
4/15/2015 |
|
|
|
|
|
|
|
Specifications |
|
|
|
Job No. 10-623 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-15-291R |
Tab |
Mowing |
Mar 25, 2015 |
Boone, Newton & Searcy Counties |
KR |
4/16/2015 |
|
|
|
|
|
|
|
Specifications |
|
|
|
Job No. 9-521 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-15-290R |
Tab |
Mowing |
Mar 25, 2015 |
Benton County |
KR |
No Bids Rec'd |
|
|
|
|
|
|
|
Specifications |
|
|
|
Job No. 9-520 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-15-289R |
Tab |
Mowing |
Mar 25, 2015 |
Benton & Washington Counties |
KR |
4/30/2015 |
|
|
|
|
|
|
|
Specifications |
|
|
|
Job No. 9-519 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-15-288R |
Tab |
Mowing |
Mar 25, 2015 |
Benton County |
KR |
4/29/2015 |
|
|
|
|
|
|
|
Specifications |
|
|
|
Job No. 9-518 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-15-287R |
Tab |
Mowing |
Mar 25, 2015 |
Montgomery County |
KR |
4/14/2015 |
|
|
|
|
|
|
|
Specifications |
|
|
|
Job No. 8-578 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-15-286R |
Tab |
Mowing |
Mar 25, 2015 |
Perry, Conway & Van Buren Counties |
KR |
No Bids Rec'd |
|
|
|
|
|
|
|
Specifications |
|
|
|
Job No. 8-577 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-15-285R |
Tab |
Mowing |
Mar 25, 2015 |
Columbia County |
KR |
4/14/2015 |
|
|
|
|
|
|
|
Specifications |
|
|
|
Job No. 7-537 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-15-284R |
Tab |
Mowing |
Mar 25, 2015 |
Columbia & Ouachita Counties |
KR |
4/14/2015 |
|
|
|
|
|
|
|
Specifications |
|
|
|
Job No. 7-536 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-15-283R |
Tab |
Mowing |
Mar 25, 2015 |
Clark County |
KR |
4/17/2015 |
|
|
|
|
|
|
|
Specifications |
|
|
|
Job No. 7-535 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-15-282R |
Tab |
Mowing |
Mar 25, 2015 |
Ouachita, Calhoun & Dallas Counties |
KR |
4/17/2015 |
|
|
|
|
|
|
|
Specifications |
|
|
|
Job No. 7-534 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-15-281R |
Tab |
Mowing |
Mar 25, 2015 |
Pulaski, Lonoke & Prairie Counties |
KR |
5/12/2015 |
|
|
|
|
|
|
|
Specifications |
|
|
|
Job No. 6-565 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-15-280R |
Tab |
Mowing |
Mar 25, 2015 |
Montgomery, Hot Spring & Garland Counties |
KR |
4/14/2015 |
|
|
|
|
|
|
|
Specifications |
|
|
|
Job No. 6-564 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-15-279R |
Tab |
Mowing |
Mar 25, 2015 |
Pulaski County |
KR |
No Bids Rec'd |
|
|
|
|
|
|
|
Specifications |
|
|
|
Job No. 6-563 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-15-278R |
Tab |
Mowing |
Mar 25, 2015 |
Hot Spring, Pulaski & Saline Counties |
KR |
4/17/2015 |
|
|
|
|
|
|
|
Specifications |
|
|
|
Job No. 6-562 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-15-277R |
Tab |
Mowing |
Mar 25, 2015 |
Cleburne, Stone & Izard Counties |
KR |
4/16/2015 |
|
|
|
|
|
|
|
Specifications |
|
|
|
Job No. 5-550 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-15-276R |
Tab |
Mowing |
Mar 25, 2015 |
Sebastian & Crawford Counties |
KR |
4/14/2015 |
|
|
|
|
|
|
|
Specifications |
|
|
|
Job No. 4-768 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-15-275R |
Tab |
Mowing |
Mar 25, 2015 |
Crawford & Washington Counties |
KR |
AWARD |
|
|
|
|
|
|
|
Specifications |
|
|
|
Job No. 4-767 |
|
RESCINDED |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-15-274R |
Tab |
Mowing |
Mar 25, 2015 |
Crawford County |
KR |
4/14/2015 |
|
|
|
|
|
|
|
Specifications |
|
|
|
Job No. 4-766 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-15-273R |
Tab |
Mowing |
Mar 25, 2015 |
Washington & Crawford Counties |
KR |
No Bids Rec'd |
|
|
|
|
|
|
|
Specifications |
|
|
|
Job No. 4-765 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-15-272R |
Tab |
Mowing |
Mar 25, 2015 |
Washington County |
KR |
4/17/2015 |
|
|
|
|
|
|
|
Specifications |
|
|
|
Job No. 4-764 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-15-271R |
Tab |
Mowing |
Mar 25, 2015 |
Sevier, Howard, Pike, Hempstead & Nevada Counties |
KR |
4/17/2015 |
|
|
|
|
|
|
|
Specifications |
|
|
|
Job No. 3-799 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-15-270R |
Tab |
Mowing |
Mar 25, 2015 |
Woodruff, Cross & Crittenden Counties |
KR |
4/17/2015 |
|
|
|
|
|
|
|
Specifications |
|
|
|
Job No. 11-560 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-15-269R |
Tab |
Mowing |
Mar 25, 2015 |
Phillips, Lee, St. Francis & Cross Counties |
KR |
4/15/2015 |
|
|
|
|
|
|
|
Specifications |
|
|
|
Job No. 11-559 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-15-268R |
Tab |
Mowing |
Mar 25, 2015 |
Phillips & Monroe Counties |
KR |
4/20/2015 |
|
|
|
|
|
|
|
Specifications |
|
|
|
Job No. 11-558 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-15-267R |
Tab |
Mowing |
Mar 25, 2015 |
Monroe & St. Francis Counties |
KR |
5/12/2015 |
|
|
|
|
|
|
|
Specifications |
|
|
|
Job No. 11-557 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-15-266R |
Tab |
Mowing |
Mar 25, 2015 |
Lee, St. Francis & Crittenden Counties |
KR |
4/17/2015 |
|
|
|
|
|
|
|
Specifications |
|
|
|
Job No. 11-556 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-15-265R |
Tab |
Mowing |
Mar 25, 2015 |
Crittenden County |
KR |
4/27/2015 |
|
|
|
|
|
|
|
Specifications |
|
|
|
Job No. 11-555 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
PT
15-02 |
Tab |
|
Mar 23, 2015 |
Transit Vehicles |
CB |
5/8/2015 |
|
|
|
|
|
|
|
|
|
|
|
FOB: Little Rock, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-15-048J |
Tab |
|
Mar 17, 2015 |
3 Items - Mineral Aggregate |
JO |
4/3/2015 |
|
|
|
|
|
|
|
|
|
|
|
FOB: Baxter, Boone
& Carroll Co. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-15-047J |
Tab |
|
Mar 17, 2015 |
5 Items - Mineral Aggregate Class 2 |
JO |
3/23/2015 |
|
|
|
|
|
|
|
|
|
|
|
FOB: Sebastian,
Franklin, Logan, |
|
|
|
|
|
|
|
|
|
|
|
|
|
Crawford & Polk Co. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-15-046J |
Tab |
|
Mar 10, 2015 |
7 Items - Mineral Aggregate Class 4 |
JO |
3/11/2015 |
|
|
|
|
|
|
|
|
|
|
|
FOB: Crittenden,
Cross, Lee, Monroe, |
|
|
|
|
|
|
|
|
|
|
|
|
|
Phillips, St. Francis & Woodruff Co. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-15-045J |
Tab |
|
Mar 3, 2015 |
1 Item - Mineral Aggregate Class 4 |
JO |
3/6/2015 |
|
|
|
|
|
|
|
|
|
|
|
FOB: Crittenden Co. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-15-044P |
Tab |
|
Mar 3, 2015 |
15 Items - Aluminum Sign Blanks |
CP |
3/12/2015 |
|
|
|
|
|
|
|
|
|
|
|
FOB: Little Rock, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-15-043J |
Tab |
|
Mar 3, 2015 |
3 Items - Mineral Aggregate Class 1 |
JO |
3/12/2015 |
|
|
|
|
|
|
|
|
|
|
|
FOB: Jackson, Sharp
& Stone Co. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-15-042J |
Tab |
|
Mar 3, 2015 |
3 Items - Mineral Aggregate Class 1 |
JO |
4/6/2015 |
|
|
|
|
|
|
|
|
|
|
|
FOB: Fulton,
Independence & Izard Co. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-15-041J |
Tab |
|
Mar 3, 2015 |
9 Items - Mineral Aggregate Class 4 |
JO |
3/12/2015 |
|
|
|
|
|
|
|
|
|
|
|
FOB: Woodruff (2), St.
Francis (2), Lee, |
|
|
|
|
|
|
|
|
|
|
|
|
|
Monroe, Phillips (2), & Crittenden Co. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-15-040J |
Tab |
|
Mar 3, 2015 |
6 Items - Mineral Aggregate Class 4 |
JO |
3/23/2015 |
|
|
|
|
|
|
|
|
|
|
|
FOB: Clay, Greene,
Mississippi, |
|
|
|
|
|
|
|
|
|
|
|
|
|
Poinsett(2) & Randolph Co. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-15-039J |
Tab |
|
Mar 3, 2015 |
2 Items - Mineral Aggregate Class 4 |
JO |
3/6/2015 |
|
|
|
|
|
|
|
|
|
|
|
FOB: Clay Co.(2) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-15-038J |
Tab |
|
Mar 3, 2015 |
3 Items - Mineral Aggregate Class 2 |
JO |
3/23/2015 |
|
|
|
|
|
|
|
|
|
|
|
FOB: Greene, Craighead
& |
|
|
|
|
|
|
|
|
|
|
|
|
|
Mississippi Co. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-15-037J |
Tab |
|
Mar 3, 2015 |
2 Items - Mineral Aggregate Class 2 |
JO |
3/6/2015 |
|
|
|
|
|
|
|
|
|
|
|
FOB: Lawrence Co.(2) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-15-036J |
Tab |
|
Feb 24, 2015 |
9 Items - Mineral Aggregate Class 2 |
JO |
4/10/2015 |
|
|
|
|
|
|
|
|
|
|
|
FOB: Conway(2),
Faulkner, Johnson, |
|
|
|
|
|
|
|
|
|
|
|
|
|
Montgomery, Perry, Pope, Van Buren & |
|
|
|
|
|
|
|
|
|
|
|
|
|
Yell Co. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-15-264P |
Tab |
|
Feb 24, 2015 |
Supply Contract for furnishing Guard Rail Maintenance
from |
CP |
3/6/2015 |
|
|
|
|
|
|
|
|
|
|
|
April 1, 2015 through March 31, 2016 |
|
|
|
|
|
|
|
|
|
|
|
|
|
FOB: Hope, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-15-263R |
Tab |
|
Feb 24, 2015 |
Steel Camper Shell |
KR |
3/23/2015 |
|
|
|
|
|
|
|
|
|
|
|
FOB: Little Rock, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-15-262R |
Tab |
|
Feb 24, 2015 |
Air Compressor, 250 CFM, Portable, Diesel, Trailer Mounted |
KR |
4/14/2015 |
|
|
|
|
|
|
|
|
|
|
|
FOB: Wynne and Camden,
AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-15-261R |
Tab |
|
Feb 24, 2015 |
Asphalt Kettle |
KR |
3/12/2015 |
|
|
|
|
|
|
|
|
|
|
|
Hope, Barling and Little Rock, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-15-260R |
Tab |
|
Feb 24, 2015 |
Asphalt Distributor, 600 Gallon Capacity, Tow Type, Diesel |
KR |
3/12/2015 |
|
|
|
|
|
|
|
|
|
|
|
FOB: Paragould, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-15-259R |
Tab |
|
Feb 24, 2015 |
Traffic Message Board, Trailer Mounted, Solar Powered |
KR |
3/24/2015 |
|
|
|
|
|
|
|
|
|
|
|
FOB: Hope and
Russellville, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-15-258R |
Tab |
|
Feb 24, 2015 |
Flashing Arrow, Trailer Mounted, Solar Powered |
KR |
3/24/2015 |
|
|
|
|
|
|
|
|
|
|
|
FOB: Camden, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-15-257R |
Tab |
|
Feb 24, 2015 |
Crash Attenuator (TMA) for Dump Truck Mounting |
KR |
3/31/2015 |
|
|
|
|
|
|
|
|
|
|
|
FOB: Barling, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-15-256R |
Tab |
|
Feb 24, 2015 |
Bitumen Machine, Trailer Mounted, For Installation of
Reflective |
KR |
3/26/2015 |
|
|
|
|
|
|
|
|
|
|
|
Pavement Markers |
|
|
|
|
|
|
|
|
|
|
|
|
|
FOB: Camden, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-15-035J |
Tab |
|
Feb 24, 2015 |
4 Items - Mineral Aggregate Class 1 |
JO |
3/6/2015 |
|
|
|
|
|
|
|
|
|
|
|
FOB: Columbia, Union,
Cleveland & |
|
|
|
|
|
|
|
|
|
|
|
|
|
Ouachita Co. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-15-255R |
Tab |
|
Feb 24, 2015 |
Supply Contract for furnishing Liquid Asphalt Materials |
KR |
3/23/2015 |
|
|
|
|
|
|
|
|
|
|
|
from April 1, 2015 thru June 30, 2015 |
|
|
|
|
|
|
|
|
|
|
|
|
|
FOB: Statewide |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-15-254J |
Tab |
|
Feb 24, 2015 |
Supply Contract for furnishing Asphalt |
JO |
3/31/2015 |
|
|
|
|
|
|
|
|
|
|
|
Concrete Cold Plant and Hot Mix |
|
|
|
|
|
|
|
|
|
|
|
|
|
Materials from April 1, 2015 thru |
|
|
|
|
|
|
|
|
|
|
|
|
|
September 30, 2015. |
|
|
|
|
|
|
|
|
|
|
|
|
|
FOB: Statewide |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-15-253J |
Tab |
|
Feb 24, 2015 |
Supply Contract for furnishing Mineral |
JO |
3/6/2015 |
|
|
|
|
|
|
|
|
|
|
|
Aggregate, Crushed Stone & Gravel Of |
|
|
|
|
|
|
|
|
|
|
|
|
|
Various Classes from April 1, 2015 |
|
|
|
|
|
|
|
|
|
|
|
|
|
thru September 30, 2015. |
|
|
|
|
|
|
|
|
|
|
|
|
|
FOB: Statewide |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-15-252J |
Tab |
|
Feb 24, 2015 |
Supply Contract for furnishing High Performance |
JO |
3/23/2015 |
|
|
|
|
|
|
|
|
|
|
|
Cold Mix from April1, 2015 thru September 30, 2015 |
|
|
|
|
|
|
|
|
|
|
|
|
|
FOB: Statewide |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
PT
15-03 |
Tab |
|
Feb 19, 2015 |
Transit Vehicles |
CB |
Rejected |
|
|
|
|
|
|
|
|
|
|
|
FOB: Little Rock |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-15-251R |
Tab |
|
Feb 10, 2015 |
Cab & Chassis |
KR |
3/19/2015 |
|
|
|
|
|
|
|
|
|
|
|
FOB: Barling, Batesville, Little Rock, Russellville and
Paragould, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-15-250R |
Tab |
|
Feb 10, 2015 |
Cab & Chassis |
KR |
3/19/2015 |
|
|
|
|
|
|
|
|
|
|
|
FOB: Wynne, Pine Bluff, Barling, Camden and Harrison, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-15-034J |
Tab |
|
Feb 10, 2015 |
6 Items - Mineral Aggregate Class 2 |
JO |
4/6/2015 |
|
|
|
|
|
|
|
|
|
|
|
FOB: Carroll, Madison,
Searcy, Newton, |
|
|
|
|
|
|
|
|
|
|
|
|
|
Baxter & Boone Co. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-15-033P |
Tab |
|
Feb 10, 2015 |
Sale of Salvage |
CP |
2/26/2015 |
|
|
|
|
|
|
|
|
|
|
|
FOB: Harrison, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-15-032J |
Tab |
|
Feb 3, 2015 |
2 Items - Mineral Aggregate Class 1 SP |
JO |
2/6/2015 |
|
|
|
|
|
|
|
|
|
|
|
FOB: Pike & Lafayette Co. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-15-031J |
Tab |
|
Feb 3, 2015 |
6 Items - Mineral Aggregate Class 1 |
JO |
2/9/2015 |
|
|
|
|
|
|
|
|
|
|
|
FOB: Hempstead, Little River, |
|
|
|
|
|
|
|
|
|
|
|
|
|
Miller, Nevada, Pike & Sevier Co. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-15-249R |
Tab |
|
Jan 27, 2015 |
Wheel Tractors |
KR |
2/18/2015 |
|
|
|
|
|
|
|
Addendum |
|
|
|
FOB: Camden, Barling,
Little Rock and Paragould, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-15-030P |
Tab |
|
Jan 13, 2015 |
Precast Concrete Box Units |
CP |
2/9/2015 |
|
|
|
|
|
|
|
|
|
|
|
FOB: Mtn. View, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-15-029P |
Tab |
|
Jan 13, 2015 |
Variable Message Sign Assemby |
CP |
2/9/2015 |
|
|
|
|
|
|
|
Addendum |
|
|
|
FOB: Little Rock, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-15-248R |
Tab |
|
Jan 13, 2015 |
Removal and Disposal of Litter from Highway Right of Way by
a |
KR |
2/27/2015 |
|
|
|
|
|
|
|
|
|
|
|
Non-Profit Workshop from February 1, 2015 thru January 31,
2016 |
|
|
|
|
|
|
|
|
|
|
|
|
|
FOB: In or near Pulaski County, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-15-028P |
Tab |
|
Jan 6, 2015 |
Salt Storage Facility |
CP |
2/9/2015 |
|
|
|
|
|
|
|
|
|
|
|
FOB: Newport, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-15-247R |
Tab |
|
Jan 6, 2015 |
8 - 10 Ton Tandem Static Roller |
KR |
1/27/2015 |
|
|
|
|
|
|
|
|
|
|
|
FOB: Little Rock, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-15-246R |
Tab |
|
Jan 6, 2015 |
3/4 Ton Pickups & Van |
KR |
3/26/2015 |
|
|
|
|
|
|
|
Addendum |
|
|
EXTENDED TO |
FOB: Little Rock, AR |
|
|
|
|
|
|
|
|
|
|
|
|
Jan 13, 2015 |
|
|
|
|
|
|
|
|
|
|
H-15-245R |
Tab |
|
Jan 6, 2015 |
1/2 Ton Pickups |
KR |
2/11/2015 |
|
|
|
|
|
|
|
Addendum |
|
|
EXTENDED TO |
FOB: Statewide |
|
|
|
|
|
|
|
|
|
|
|
|
Jan 13, 2015 |
|
|
|
|
|
|
|
|
|
|
M-15-027P |
Tab |
|
Dec 9, 2014 |
Precast Concrete Box Units, 10' x 5' x 6' |
CP |
Rejected |
|
|
|
|
|
|
|
|
|
|
|
FOB: Mtn. View, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-15-026P |
Tab |
|
Dec 9, 2014 |
7 Items - Aluminum Sign Blanks |
CP |
12/29/2014 |
|
|
|
|
|
|
|
|
|
|
|
FOB: Little Rock, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-15-025P |
Tab |
|
Dec 9, 2014 |
10 Items - Aluminum Sign Blanks |
CP |
12/29/2014 |
|
|
|
|
|
|
|
|
|
|
|
FOB: Little Rock, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-15-244R |
Tab |
|
Dec 9, 2014 |
Cab & Chassis |
KR |
1/12/2015 |
|
|
|
|
|
|
|
|
|
|
|
FOB: Hope and Pine
Bluff, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-15-243R |
Tab |
|
Dec 9, 2014 |
Cab & Chassis |
KR |
1/12/2015 |
|
|
|
|
|
|
|
|
|
|
|
FOB: Pine Bluff, Hope,
Barling, Batesville, Camden, Paragould, |
|
|
|
|
|
|
|
|
|
|
|
|
|
Wynne and Russellville, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-15-242R |
Tab |
|
Dec 2, 2014 |
Snow Plow |
KR |
1/8/2015 |
|
|
|
|
|
|
|
|
|
|
|
FOB: Batesville,
Harrison, Wynne, Hope, Barling & Russellville, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-15-240J |
Tab |
|
Dec 2, 2014 |
Supply Contract for furnishing Portland |
JO |
12/12/2014 |
|
|
|
|
|
|
|
|
|
|
|
Type 1 Cement In 94 lbs. Bags. |
|
|
|
|
|
|
|
|
|
|
|
|
|
From Jan 1, 2015 thru Dec 31, 2015. |
|
|
|
|
|
|
|
|
|
|
|
|
|
FOB: Dist. 7, Camden,
AR. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-15-239J |
Tab |
|
Dec 2, 2014 |
Supply Contract For Furnishing Portland |
JO |
12/12/2014 |
|
|
|
|
|
|
|
|
|
|
|
Type 1 Cement in 94 lbs. Bags. |
|
|
|
|
|
|
|
|
|
|
|
|
|
From Jan 1, 2015 thru Dec 31, 2015. |
|
|
|
|
|
|
|
|
|
|
|
|
|
FOB: Dist. 6, Little Rock, AR. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-15-238J |
Tab |
|
Dec 2, 2014 |
Supply Contract for furnishing Portland |
JO |
12/12/2014 |
|
|
|
|
|
|
|
|
|
|
|
Type 1 Cement In 94 lbs. Bags. |
|
|
|
|
|
|
|
|
|
|
|
|
|
From Jan 1, 2015 thru Dec. 31, 2015. |
|
|
|
|
|
|
|
|
|
|
|
|
|
FOB: (Dist. 3)
Hempstead, Howard, Lafayette, |
|
|
|
|
|
|
|
|
|
|
|
|
|
Little River, Miller, Nevada, Pike and Sevier Co. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-15-237J |
Tab |
|
Dec 2, 2014 |
Supply Contract for furnishing Portland |
JO |
12/12/2014 |
|
|
|
|
|
|
|
|
|
|
|
Type 1 Cement In 94 lbs. Bags. |
|
|
|
|
|
|
|
|
|
|
|
|
|
From Jan 1, 2015 thru Dec. 31, 2015. |
|
|
|
|
|
|
|
|
|
|
|
|
|
FOB: Dist. 2, Pine
Bluff, AR. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-15-241R |
Tab |
|
Nov 18, 2014 |
Supply Contract for furnishing Liquid Asphalt Materials |
KR |
12/17/2014 |
|
|
|
|
|
|
|
|
|
|
|
from January 1, 2015 thru March 31, 2015 |
|
|
|
|
|
|
|
|
|
|
|
|
|
FOB: Statewide |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-15-236J |
Tab |
|
Nov 18, 2014 |
Supply Contract for furnishing Asphalt |
JO |
1/22/2015 |
|
|
|
|
|
|
|
|
|
|
|
Concrete Cold Plant and Hot Mix |
|
|
|
|
|
|
|
|
|
|
|
|
|
Materials from January 1, 2015 thru |
|
|
|
|
|
|
|
|
|
|
|
|
|
March 31, 2015. |
|
|
|
|
|
|
|
|
|
|
|
|
|
FOB: Statewide |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-15-235J |
Tab |
|
Nov 18, 2014 |
Supply Contract for furnishing Mineral |
JO |
11/26/2014 |
|
|
|
|
|
|
|
|
|
|
|
Aggregate, Crushed Stone & Gravel Of |
|
|
|
|
|
|
|
|
|
|
|
|
|
Various Classes from January 1, 2015 |
|
|
|
|
|
|
|
|
|
|
|
|
|
thru March 31, 2015. |
|
|
|
|
|
|
|
|
|
|
|
|
|
FOB: Statewide |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-15-234J |
Tab |
|
Nov 18, 2014 |
Supply Contract for furnishing High Performance |
JO |
12/12/2014 |
|
|
|
|
|
|
|
|
|
|
|
Cold Mix from January 1, 2015 thru |
|
|
|
|
|
|
|
|
|
|
|
|
|
March 31, 2015 |
|
|
|
|
|
|
|
|
|
|
|
|
|
FOB: Statewide |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-15-233J |
Tab |
|
Nov 18, 2014 |
Supply Contract for furnishing |
JO |
12/10/2014 |
|
|
|
|
|
|
|
|
|
|
|
Corrugated Pipe Culvert From 1/1/2015 |
|
|
|
|
|
|
|
|
|
|
|
|
|
thru 6/30/2015 |
|
|
|
|
|
|
|
|
|
|
|
|
|
FOB: Statewide |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-15-024P |
Tab |
|
Nov 18, 2014 |
Global Positioning System (GPS) |
CP |
1/9/2015 |
|
|
|
|
|
|
|
|
|
|
|
Survey System |
|
|
|
|
|
|
|
|
|
|
|
|
|
FOB: Little Rock, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-15-023P |
Tab |
|
Nov 18, 2014 |
Salt Storage Facility |
CP |
Rejected |
|
|
|
|
|
|
|
|
|
|
|
FOB: Newport, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-15-022P |
Tab |
|
Nov 18, 2014 |
Salt Brine Production System |
CP |
1/2/2015 |
|
|
|
|
|
|
|
|
|
|
|
FOB: Newport, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-15-232R |
Tab |
|
Nov 4, 2014 |
De-Icing Material Spreader |
KR |
12/5/2014 |
|
|
|
|
|
|
|
Addendum |
|
|
|
FOB: Paragould,
Batesville, Barling and Wynne, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-15-231J |
Tab |
|
Nov 4, 2014 |
Supply Contract for furnishing |
JO |
12/4/2014 |
|
|
|
|
|
|
|
|
|
|
|
Vegetation Control Chemicals from |
|
|
|
|
|
|
|
|
|
|
|
|
|
December 1, 2014 thru November 30, 2015. |
|
|
|
|
|
|
|
|
|
|
|
|
|
FOB: Statewide |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-15-021P |
Tab |
|
Nov 4, 2014 |
Precast Concrete Box Units 10' x 5' x 6' |
CP |
No Bids Rec'd |
|
|
|
|
|
|
|
|
|
|
|
FOB: Mountain View, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-15-230P |
Tab |
|
Nov 4, 2014 |
Supply Contract for furnishing A-Frame Barricade System
from |
CP |
12/8/2014 |
|
|
|
|
|
|
|
|
|
|
|
January 1, 2015 thru December 31, 2015 |
|
|
|
|
|
|
|
|
|
|
|
|
|
FOB: Statewide |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-15-020P |
Tab |
|
Oct 21, 2014 |
Roof Renovation |
CP |
11/19/2014 |
|
|
|
|
|
|
|
|
|
|
|
FOB: Little Rock, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-15-229R |
Tab |
|
Oct 21, 2014 |
Road Sweepers |
KR |
11/4/2014 |
|
|
|
|
|
|
|
|
|
|
|
FOB: Batesville and
Barling, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-15-228P |
Tab |
|
Oct 21, 2014 |
Stop and Slow Paddles |
CP |
11/20/2014 |
|
|
|
|
|
|
|
|
|
|
|
FOB: Statewide |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-15-227R |
Tab |
|
Oct 21, 2014 |
Regenerative Air Sweeper |
KR |
11/17/2014 |
|
|
|
|
|
|
|
Addendum |
|
|
|
FOB: Little Rock, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-15-226R |
Tab |
|
Oct 21, 2014 |
Wheel Tractor, 75 PTO Horsepower, 4WD |
KR |
11/17/2014 |
|
|
|
|
|
|
|
|
|
|
|
FOB: Batesville, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-15-225R |
Tab |
|
Oct 21, 2014 |
Wheel Tractor, 55 PTO Horsepower, 2WD |
KR |
11/19/2014 |
|
|
|
|
|
|
|
|
|
|
|
FOB: Batesville, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-15-224R |
Tab |
|
Oct 14, 2014 |
Backhoe/Front End Loader |
KR |
11/18/2014 |
|
|
|
|
|
|
|
Addendum |
|
|
EXTENDED TO |
FOB: Little Rock,
Paragould, Batesville & Russellville, AR |
|
|
|
|
|
|
|
|
|
Addendum |
|
|
Oct 21, 2014 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-15-019P |
Tab |
|
Oct 14, 2014 |
Sale of Salvage |
CP |
10/15/2014 |
|
|
|
|
|
|
|
|
|
|
|
FOB: Batesville, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-15-018J |
Tab |
|
Sep 30, 2014 |
6 Items - Carbide Tipped Underbody |
JO |
10/15/2014 |
|
|
|
|
|
|
|
|
|
|
|
Scraper Blades. |
|
|
|
|
|
|
|
|
|
|
|
|
|
FOB: Little Rock (D-6,
E&P) |
|
|
|
|
|
|
|
|
|
|
|
|
|
& Harrison |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-15-017P |
Tab |
|
Sep 9, 2014 |
Single Prisoner Transport System |
CP |
10/7/2014 |
|
|
|
|
|
|
|
|
|
|
|
FOB: Little Rock, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-15-223R |
Tab |
Mowing |
Sep 9, 2014 |
Pulaski, Lonoke and
Saline Counties |
KR |
9/23/2014 |
|
|
|
|
|
|
|
Specifications |
|
|
|
(Job No. 6-561) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-15-016J |
Tab |
|
Sep 9, 2014 |
18 Items - Anti-Freeze |
JO |
9/9/2014 |
|
|
|
|
|
|
|
|
|
|
|
FOB: Wynne, Pine
Bluff, Hope, Barling, |
|
|
|
|
|
|
|
|
|
|
|
|
|
Batesville, Little Rock, Camden & |
|
|
|
|
|
|
|
|
|
|
|
|
|
Paragould, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-15-015P |
Tab |
|
Sep 9, 2014 |
Asbestos Abatement and Demolition |
CP |
9/16/2014 |
|
|
|
|
|
|
|
|
|
|
|
FOB: Benton
County (Job #001966) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-15-014P |
Tab |
|
Sep 9, 2014 |
3 Items - Aluminum Blanks |
CP |
9/11/2014 |
|
|
|
|
|
|
|
|
|
|
|
FOB: Little Rock, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-15-013P |
Tab |
|
Sep 9, 2014 |
11 Items - Aluminum Sign Blanks |
CP |
9/16/2014 |
|
|
|
|
|
|
|
|
|
|
|
FOB: Little Rock, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-15-222R |
Tab |
|
Sep 9, 2014 |
Supply Contract for furnishing Liquid Asphalt Materials |
KR |
9/30/2014 |
|
|
|
|
|
|
|
|
|
|
|
from October 1, 2014 thru December 31, 2014 |
|
|
|
|
|
|
|
|
|
|
|
|
|
FOB: Statewide |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-15-008P |
Tab |
|
Aug 26, 2014 |
Salt Brine Production System |
CP |
9/29/2014 |
|
|
|
|
|
|
|
|
|
|
|
FOB: Barling &
Mountain Home, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-15-221J |
Tab |
|
Aug 19, 2014 |
Supply Contract for furnishing Mineral |
JO |
8/27/2014 |
|
|
|
|
|
|
|
|
|
|
|
Aggregate, Crushed Stone & Gravel Of |
|
|
|
|
|
|
|
|
|
|
|
|
|
Various Classes from October 1, 2014 |
|
|
|
|
|
|
|
|
|
|
|
|
|
thru December 31, 2014. |
|
|
|
|
|
|
|
|
|
|
|
|
|
FOB: Statewide |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-15-220J |
Tab |
|
Aug 19, 2014 |
Supply Contract for furnishing Asphalt |
JO |
9/25/2014 |
|
|
|
|
|
|
|
|
|
|
|
Concrete Cold Plant and Hot Mix |
|
|
|
|
|
|
|
|
|
|
|
|
|
Materials from October 1, 2014 thru |
|
|
|
|
|
|
|
|
|
|
|
|
|
December 31, 2014. |
|
|
|
|
|
|
|
|
|
|
|
|
|
FOB: Statewide |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-15-219J |
Tab |
|
Aug 19, 2014 |
Supply Contract for furnishing High Performance |
JO |
8/27/2014 |
|
|
|
|
|
|
|
ADDENDUM |
|
|
|
Cold Mix from October 1, 2014 thru |
|
|
|
|
|
|
|
|
|
|
|
|
|
December 31, 2014. |
|
|
|
|
|
|
|
|
|
|
|
|
|
FOB: Statewide |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-15-218J |
Tab |
|
Aug 19, 2014 |
Supply Contract for furnishing Pretreated Rock |
JO |
9/11/2014 |
|
|
|
|
|
|
|
ADDENDUM |
|
|
|
Salt, Rock Salt & Calcium Chloride from |
|
|
|
|
|
|
|
|
|
|
|
|
|
October 1, 2014 thru March 31, 2015 |
|
|
|
|
|
|
|
|
|
|
|
|
|
FOB: Statewide |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-15-217J |
Tab |
|
Aug 19, 2014 |
Supply Contract for furnishing Liquid |
JO |
9/10/2014 |
|
|
|
|
|
|
|
|
|
|
|
Magnesium Chloride (w/o corrosion |
|
|
|
|
|
|
|
|
|
|
|
|
|
inhibited liquids) from October 1, 2014 |
|
|
|
|
|
|
|
|
|
|
|
|
|
thru March 31, 2015. |
|
|
|
|
|
|
|
|
|
|
|
|
|
FOB: Statewide |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-15-216J |
Tab |
|
Aug 19, 2014 |
Supply Contract for furnishing Liquid |
JO |
9/19/2014 |
|
|
|
|
|
|
|
|
|
|
|
Calcium Chloride (w/o corrosion inhibited |
|
|
|
|
|
|
|
|
|
|
|
|
|
liquids) from October 1, 2014 thru |
|
|
|
|
|
|
|
|
|
|
|
|
|
March 31, 2015. |
|
|
|
|
|
|
|
|
|
|
|
|
|
FOB: Statewide |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-15-215J |
Tab |
|
Aug 19, 2014 |
Supply Contract for furnishing Liquid |
JO |
9/10/2014 |
|
|
|
|
|
|
|
|
|
|
|
Magnesium Chloride (corrosion inhibited |
|
|
|
|
|
|
|
|
|
|
|
|
|
liquids) from October
1, 2014 thru |
|
|
|
|
|
|
|
|
|
|
|
|
|
March 31, 2015. |
|
|
|
|
|
|
|
|
|
|
|
|
|
FOB: Statewide |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-15-012J |
Tab |
|
Aug 19, 2014 |
12 Items - Carbide Tipped Snowplow |
JO |
9/8/2014 |
|
|
|
|
|
|
|
|
|
|
|
Blades |
|
|
|
|
|
|
|
|
|
|
|
|
|
FOB: Pine Bluff,
Barling, Batesville, |
|
|
|
|
|
|
|
|
|
|
|
|
|
Russellville & Paragould, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-15-011J |
Tab |
|
Aug 19, 2014 |
16 Items - Grader Blades |
JO |
9/8/2014 |
|
|
|
|
|
|
|
|
|
|
|
FOB: Wynne, Barling,
Batesville, |
|
|
|
|
|
|
|
|
|
|
|
|
|
Russellville & Paragould, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-15-010J |
Tab |
|
Aug 19, 2014 |
9 Items - Tire Chains |
JO |
8/19/2014 |
|
|
|
|
|
|
|
|
|
|
|
FOB: Barling, Batesville & |
|
|
|
|
|
|
|
|
|
|
|
|
|
Russellville, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
RFP-15-003P |
|
|
Aug 12, 2014 |
Conducting a Public Auction of Used & |
CP |
|
|
|
|
|
|
|
|
|
|
|
|
Surplus Equipment |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-15-009J |
Tab |
|
Aug 12, 2014 |
18 Items - Anti-Freeze |
JO |
Reject
and Re-Advertise |
|
|
|
|
|
|
|
|
|
|
|
FOB: Wynne, Pine
Bluff, Hope, Barling, |
|
|
|
|
|
|
|
|
|
|
|
|
Batesville, Little Rock, Camden & |
|
|
|
|
|
|
|
|
|
|
|
|
|
Paragould, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-15-214R |
Tab |
|
Aug 12, 2014 |
Steel Camper Shell |
KR |
8/28/2014 |
|
|
|
|
|
|
|
|
|
|
|
FOB: Little Rock, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-15-213R |
Tab |
|
Aug 12, 2014 |
Snow Plow, 12' Reversible for Truck Mounting, w/Central
Hydraulics |
KR |
8/27/2014 |
|
|
|
|
|
|
|
ADDENDUM |
|
|
|
FOB: Little Rock, AR |
|
|
|
|
|
|
|
|
|
ADDENDUM 2 |
|
|
|
|
|
|
|
|
|
|
|
|
|
M-15-007P |
Tab |
|
Jul 29, 2014 |
3 Items - Elastically Modified Joint and |
CP |
8/5/2014 |
|
|
|
|
|
|
|
|
|
|
|
Crack Sealant |
|
|
|
|
|
|
|
|
|
|
|
|
|
FOB: Barling, Camden
& |
|
|
|
|
|
|
|
|
|
|
|
|
|
Russellville, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-15-006P |
Tab |
|
Jul 29, 2014 |
1 Item - Self Leveling Type 2 Joint and |
CP |
8/5/2014 |
|
|
|
|
|
|
|
|
|
|
|
Crack Sealant |
|
|
|
|
|
|
|
|
|
|
|
|
|
FOB: Harrison, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-15-005P |
Tab |
|
Jul 29, 2014 |
1 Item - Self Leveling Type 1 Joint and |
CP |
8/5/2014 |
|
|
|
|
|
|
|
|
|
|
|
Crack Sealant |
|
|
|
|
|
|
|
|
|
|
|
|
|
FOB: Hope, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
RFP-15-001P |
|
|
Aug 1, 2014 |
Request for Proposals for Disadvantaged Business Enterprise |
CP |
|
|
|
|
|
|
|
|
|
|
|
|
Supportive Services Program |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-15-004P |
|
|
Jul 29, 2014 |
3-D Laser Pavement Surface Imaging |
CP |
|
|
|
|
|
|
|
|
ADDENDUM |
|
|
CANCELLED PRIOR |
and Analysis System |
|
|
|
|
|
|
|
|
|
|
|
|
TO BID OPENING |
FOB: Little Rock, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
RFP-15-002P |
|
|
Jul 23, 2014 |
Request for Proposals for Statewide Weather Forecast Service |
CP |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-15-003J |
Tab |
|
Jul 17, 2014 |
Rock Salt (Solid, Pretreated) |
JO |
7/18/2014 |
|
|
|
|
|
|
|
|
|
|
|
FOB: Statewide as noted
on Bid Forms |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-15-212P |
Tab |
|
Jul 8, 2014 |
Contract for furnishing Guardrail Maintenance from Date
of |
CP |
7/9/2014 |
|
|
|
|
|
|
|
|
|
|
|
Award thru June 30, 2015. |
|
|
|
|
|
|
|
|
|
|
|
|
|
FOB: Camden, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-15-002J |
Tab |
|
Jul 8, 2014 |
Rock Salt (Solid, Pretreated) |
JO |
Reject and |
|
|
|
|
|
|
|
|
|
|
|
FOB: Statewide as
noted on Bid Forms |
|
Re-advertise |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-15-211R |
Tab |
|
Jun 24, 2014 |
Removal and Disposal of Litter from Highway Right of Way by
a |
KR |
7/7/2014 |
|
|
|
|
|
|
|
|
|
|
|
Non-Profit Workshop from July, 1, 2014 thru June 30, 2015 |
|
|
|
|
|
|
|
|
|
|
|
|
|
FOB: Crawford and
Sebastian Counties |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-15-001P |
Tab |
|
Jun 24, 2014 |
2 Items - 65' x 100' Membrane-Covered |
CP |
7/7/2014 |
|
|
|
|
|
|
|
Addendum |
|
|
|
Salt Storage Building |
|
|
|
|
|
|
|
|
|
|
|
|
|
FOB: Mt. Home, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-15-210P |
Tab |
|
Jun 17, 2014 |
Supply Contract for furnishing AHTD (Baseball |
CP |
7/7/2014 |
|
|
|
|
|
|
|
|
|
|
|
Style) High Visibility Mesh Work Cap |
|
|
|
|
|
|
|
|
|
|
|
|
|
FOB: Little Rock, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-15-209P |
Tab |
|
Jun 10, 2014 |
Service Contract for furnishing Janitorial and |
CP |
7/3/2014 |
|
|
|
|
|
|
|
|
|
|
|
Cleaning Services from Date of Award thru |
|
|
|
|
|
|
|
|
|
|
|
|
|
June 30, 2015. |
|
|
|
|
|
|
|
|
|
|
|
|
|
FOB: Ft. Smith, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-15-208P |
Tab |
|
Jun 3, 2014 |
Service Contract for furnishing Security Services |
CP |
6/19/2014 |
|
|
|
|
|
|
|
|
|
|
|
from July 1, 2014 thru June 30, 2015. |
|
|
|
|
|
|
|
|
|
|
|
|
|
FOB: Batesville, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-15-207R |
Tab |
|
Jun 3, 2014 |
Supply Contract for furnishing Liquid Asphalt Materials |
KR |
6/26/2014 |
|
|
|
|
|
|
|
|
|
|
|
from July 1, 2014 thru September 30, 2014 |
|
|
|
|
|
|
|
|
|
|
|
|
|
FOB: Statewide |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-15-206R |
Tab |
|
Jun 3, 2014 |
Removal and Disposal of Litter from Highway Right of Way by
a |
KR |
7/7/2014 |
|
|
|
|
|
|
|
|
|
|
|
Non-Profit Workshop from July, 1, 2014 thru June 30, 2015 |
|
|
|
|
|
|
|
|
|
|
|
|
|
FOB: Crawford and
Sebastian Counties |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-15-205P |
Tab |
|
Jun 3, 2014 |
Supply Contract for furnishing Sign and/or |
CP |
7/2/2014 |
|
|
|
|
|
|
|
|
|
|
|
Delineator Post from July 1, 2014 thru |
|
|
|
|
|
|
|
|
|
|
|
|
|
December 31, 2014. |
|
|
|
|
|
|
|
|
|
|
|
|
|
FOB: Statewide |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-15-204J |
Tab |
|
Jun 3, 2014 |
Supply Contract for furnishing Mineral |
JO |
6/10/2014 |
|
|
|
|
|
|
|
|
|
|
|
Aggregate, Crushed Stone & Gravel Of |
|
|
|
|
|
|
|
|
|
|
|
|
|
Various Classes from July 1, 2014 |
|
|
|
|
|
|
|
|
|
|
|
|
|
thru September 30, 2014. |
|
|
|
|
|
|
|
|
|
|
|
|
|
FOB: Statewide |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-15-203J |
Tab |
|
Jun 3, 2014 |
Supply Contract for furnishing Asphalt |
JO |
6/26/2014 |
|
|
|
|
|
|
|
|
|
|
|
Concrete Cold Plant and Hot Mix |
|
|
|
|
|
|
|
|
|
|
|
|
|
Materials from July 1, 2014 thru |
|
|
|
|
|
|
|
|
|
|
|
|
|
September 30, 2014. |
|
|
|
|
|
|
|
|
|
|
|
|
|
FOB: Statewide |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-15-202J |
Tab |
|
May 20, 2014 |
Supply Contract for furnishing |
JO |
6/10/2014 |
|
|
|
|
|
|
|
|
|
|
|
Corrugated Pipe Culvert From 7/1/2014 |
|
|
|
|
|
|
|
|
|
|
|
|
|
thru 12/31/2014 |
|
|
|
|
|
|
|
|
|
|
|
|
|
FOB: Statewide |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-15-201J |
Tab |
|
May 20, 2014 |
Contract for furnishing Fast Setting |
JO |
6/3/2014 |
|
|
|
|
|
|
|
|
|
|
|
Cement from July 1, 2014 thru |
|
|
|
|
|
|
|
|
|
|
|
|
|
June 30, 2015. |
|
|
|
|
|
|
|
|
|
|
|
|
|
FOB: Little Rock, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-15-200H |
Tab |
|
Apr 22, 2014 |
Cab & Chassis, 58,000 lbs. GVWR, 15' Dump Body And Hoist, |
MH |
5/13/2014 |
|
|
|
|
|
|
|
|
|
|
|
Underbody Scraper And Central Hydraulics With Chemical
Spreader |
|
|
|
|
|
|
|
|
|
|
|
|
|
Rate Control System |
|
|
|
|
|
|
|
|
|
|
|
|
|
FOB: Little Rock,
AR (Central Shops) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|