NOTICE TO BIDDERS |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
The Arkansas State Highway and Transportation Department will
receive sealed bids for the following items,until time and date specified, at
which time they will be publicly opened and read. Bids must be
submitted on AHTD forms and can be obtained by clicking on the desired Bid
Number or by calling (501) 569-2667.
If you elect to download bid information from this site, remember to
check back prior to your bid opening date for any updates (Addendums) to your
bid information. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
If you need help
with this page click here -----> |
Help |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Bid No. |
Tab |
Mowing |
Opening Date |
Description |
Buyer |
Awarded |
|
|
|
|
H-12-119R |
Tab |
Mowing |
Jun 12, 2012 |
Hempstead and Nevada Counties |
KR |
6/22/2012 |
|
|
|
|
Specifications |
|
|
|
Job No. 3-797 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-118R |
Tab |
|
May 22, 2012 |
Cab & Chassis, 33,000 lbs., GVWR, |
KR |
6/6/2012 |
|
|
|
|
|
|
|
|
Automatic Transmission, 84" CA, with |
|
|
|
|
|
|
|
|
|
|
Crossmemberless Dump Body and Hoist, |
|
|
|
|
|
|
|
|
|
|
6 CY Capacity |
|
|
|
|
|
|
|
|
|
|
FOB: Ft. Smith,
Harrison & Paragould, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-117R |
Tab |
|
May 22, 2012 |
Tractor Truck with Winch, 53,000 lbs. |
KR |
6/6/2012 |
|
|
|
|
|
|
|
|
GVWR |
|
|
|
|
|
|
|
|
|
|
FOB: Little Rock and
Camden, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-12-089R |
Tab |
|
May 22, 2012 |
Truck Mounted Insulated Articulating |
KR |
6/6/2012 |
|
|
|
|
|
|
|
|
Telescopic Aerial Lift and Body |
|
|
|
|
|
|
|
|
|
|
FOB: Fort Smith, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-12-087R |
Tab |
|
May 22, 2012 |
Truck Mounted Regenerative Air |
KR |
6/6/2012 |
|
|
|
|
|
|
|
|
Sweeper |
|
|
|
|
|
|
|
|
|
|
FOB: Little Rock, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-12-086R |
Tab |
|
May 15, 2012 |
Extended Cab & Chassis, 16,000 lbs. |
KR |
6/6/2012 |
|
|
|
|
ADDENDUM |
|
|
|
GVWR, Diesel, Automatic Transmission, |
|
|
|
|
|
|
|
|
|
|
60" CA, with Flatbed Body |
|
|
|
|
|
|
|
|
|
|
FOB: Little Rock, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-116R |
Tab |
|
May 15, 2012 |
Crawler Tractor with Hydraulic |
KR |
6/6/2012 |
|
|
|
|
|
|
|
|
Controlled Angle & Tilt Dozer |
|
|
|
|
|
|
|
|
|
|
Attachment |
|
|
|
|
|
|
|
|
|
|
FOB: Pine Bluff, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-12-085R |
Tab |
|
May 15, 2012 |
Truck Mounted Crash Attenuator |
KR |
6/6/2012 |
|
|
|
|
|
|
|
|
NCHRP 350, Test Level 3 |
|
|
|
|
|
|
|
|
|
|
FOB: Fort Smith, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-12-084R |
Tab |
|
May 15, 2012 |
Trailer Mounted Flashing Arrow, Solar |
KR |
6/6/2012 |
|
|
|
|
|
|
|
|
Powered |
|
|
|
|
|
|
|
|
|
|
FOB: Little Rock, Pine
Bluff, Hope, |
|
|
|
|
|
|
|
|
|
|
Ft. Smith and Batesville, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-12-083R |
|
|
May 15, 2012 |
Truck Mounted Regenerative Air |
KR |
|
|
|
|
|
ADDENDUM |
|
|
CANCELLED |
Sweeper, On COE Chassis |
|
|
|
|
|
|
|
|
|
PRIOR TO |
FOB: Little Rock, AR |
|
|
|
|
|
|
|
|
|
BID OPENING |
|
|
|
|
|
|
|
M-12-082R |
Tab |
|
May 15, 2012 |
Cab & Chassis, 16,000 lbs. GVWR, |
KR |
6/6/2012 |
|
|
|
|
ADDENDUM |
|
|
|
Diesel, 84" CA, with Standard Height |
|
|
|
|
|
|
|
|
|
|
Service Body |
|
|
|
|
|
|
|
|
|
|
FOB: Paragould, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-12-081P |
Tab |
|
May 8, 2012 |
Sale of Salvage |
CP |
5/11/2012 |
|
|
|
|
|
|
|
|
FOB: Hope, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-12-080P |
Tab |
|
May 8, 2012 |
2 Items - Aluminum Sign Blanks |
CP |
5/9/2012 |
|
|
|
|
|
|
|
|
FOB: Little Rock, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-12-079P |
Tab |
|
May 8, 2012 |
5 Items - Aluminum Sign Blanks |
CP |
5/9/2012 |
|
|
|
|
|
|
|
|
FOB: Little Rock, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-12-078P |
Tab |
|
May 8, 2012 |
Global Positioning System (GPS) |
CP |
5/17/2012 |
|
|
|
|
|
|
|
|
Survey System |
|
|
|
|
|
|
|
|
|
|
FOB: Little Rock, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-12-077P |
Tab |
|
May 8, 2012 |
Global Positioning System (GPS) |
CP |
5/17/2012 |
|
|
|
|
|
|
|
|
Survey System |
|
|
|
|
|
|
|
|
|
|
FOB: Little Rock, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-115R |
Tab |
|
May 1, 2012 |
Fiberglass Tonneau & Steel Covers |
KR |
5/7/2012 |
|
|
|
|
|
|
|
|
FOB: Little Rock, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-114P |
Tab |
|
May 1, 2012 |
Sale of Scrap Steel |
CP |
5/7/2012 |
|
|
|
|
|
|
|
|
FOB: Little Rock, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-12-076P |
Tab |
|
May 1, 2012 |
Furnish and Install New Chain Link |
CP |
5/3/2012 |
|
|
|
|
|
|
|
|
Fence |
|
|
|
|
|
|
|
|
|
|
FOB: Hot Springs, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-12-075P |
Tab |
|
May 1, 2012 |
Roofs Renovation |
CP |
5/7/2012 |
|
|
|
|
|
|
|
|
FOB: Little Rock, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-12-074A |
Tab |
|
May 1, 2012 |
1 Items - Mineral Aggregate Class 2 |
GPA |
5/4/2012 |
|
|
|
|
|
|
|
|
FOB: Ashley Co. |
|
|
|
|
7 |
|
|
|
|
|
|
|
|
|
|
|
|
M-12-073A |
Tab |
|
May 1, 2012 |
6 Items - Mineral Aggregate Class 4 |
GPA |
5/7/2012 |
|
|
|
|
|
|
|
|
FOB: Drew,Jefferson,Lincoln & Arkansas |
|
|
|
|
|
|
|
|
|
|
& Chicot Co. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-12-072A |
Tab |
|
Apr 10, 2012 |
7 Items - Mineral Aggregate Class 2 |
GPA |
4/17/2012 |
|
|
|
|
|
|
|
|
FOB: Washington, Sebastian, Polk, |
|
|
|
|
|
|
|
|
|
|
Scott, Franklin & Logan Counties |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-12-071A |
Tab |
|
Apr 10, 2012 |
1 Item - Mineral Aggregate Class 4 |
GPA |
4/12/2012 |
|
|
|
|
|
|
|
|
FOB: Washington County |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-12-070P |
Tab |
|
Apr 10, 2012 |
Central Office Tower Fan Coil |
CP |
4/17/2012 |
|
|
|
|
|
|
|
|
Replacement |
|
|
|
|
|
|
|
|
|
|
FOB: Little Rock, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-113R |
Tab |
Mowing |
Mar 28, 2012 |
Lawrence, Greene & Craighead Counties |
KR |
4/10/2012 |
|
|
|
|
Specifications |
|
|
|
Job # 10-617 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-112R |
Tab |
Mowing |
Mar 28, 2012 |
Poinsett & Craighead Counties |
KR |
4/10/2012 |
|
|
|
|
Specifications |
|
|
|
Job # 10-616 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-111R |
Tab |
Mowing |
Mar 28, 2012 |
Craighead & Mississippi Counties |
KR |
4/10/2012 |
|
|
|
|
Specifications |
|
|
|
Job # 10-615 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-110R |
Tab |
Mowing |
Mar 28, 2012 |
Madison, Carroll & Boone Counties |
KR |
4/10/2012 |
|
|
|
|
Specifications |
|
|
|
Job # 9-517 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-109R |
Tab |
Mowing |
Mar 28, 2012 |
Franklin, Madison & Carroll Counties |
KR |
4/10/2012 |
|
|
|
|
Specifications |
|
|
|
Job # 9-516 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-108R |
Tab |
Mowing |
Mar 28, 2012 |
Faulkner & Van Buren Counties |
KR |
4/10/2012 |
|
|
|
|
Specifications |
|
|
|
Job # 8-567 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-107R |
Tab |
Mowing |
Mar 28, 2012 |
Perry & Yell Counties |
KR |
4/10/2012 |
|
|
|
|
Specifications |
|
|
|
Job # 8-566 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-106R |
Tab |
Mowing |
Mar 28, 2012 |
Union County |
KR |
4/10/2012 |
|
|
|
|
Specifications |
|
|
|
Job # 7-529 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-105R |
Tab |
Mowing |
Mar 28, 2012 |
Columbia County |
KR |
4/10/2012 |
|
|
|
|
Specifications |
|
|
|
Job # 7-528 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-104R |
Tab |
Mowing |
Mar 28, 2012 |
Union County |
KR |
4/10/2012 |
|
|
|
|
Specifications |
|
|
|
Job # 7-527 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-103R |
Tab |
Mowing |
Mar 28, 2012 |
Dallas & Cleveland Counties |
KR |
4/10/2012 |
|
|
|
|
Specifications |
|
|
|
Job # 7-526 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-102R |
Tab |
Mowing |
Mar 28, 2012 |
Dallas, Calhoun, Cleveland & |
KR |
4/10/2012 |
|
|
|
|
Specifications |
|
|
|
Bradley Counties |
|
|
|
|
|
|
|
|
|
|
Job # 7-525 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-101R |
Tab |
Mowing |
Mar 28, 2012 |
Columbia & Ouachita Counties |
KR |
4/10/2012 |
|
|
|
|
Specifications |
|
|
|
Job # 7-524 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-100R |
Tab |
Mowing |
Mar 28, 2012 |
Clark County |
KR |
4/10/2012 |
|
|
|
|
Specifications |
|
|
|
Job # 7-523 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-099R |
Tab |
Mowing |
Mar 28, 2012 |
Union, Ouachita & Calhoun |
KR |
4/10/2012 |
|
|
|
|
Specifications |
|
|
|
Counties |
|
|
|
|
|
|
|
|
|
|
Job # 7-522 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-098R |
Tab |
Mowing |
Mar 28, 2012 |
Bradley & Union Counties |
KR |
4/10/2012 |
|
|
|
|
Specifications |
|
|
|
Job #7-521 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-097R |
Tab |
Mowing |
Mar 28, 2012 |
Garland & Saline Counties |
KR |
4/10/2012 |
|
|
|
|
Specifications |
|
|
|
Job # 6-550 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-096R |
Tab |
Mowing |
Mar 28, 2012 |
Pulaski County |
KR |
4/10/2012 |
|
|
|
|
Specifications |
|
|
|
Job # 6-549 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-095R |
Tab |
Mowing |
Mar 28, 2012 |
Jackson County |
KR |
4/10/2012 |
|
|
|
|
Specifications |
|
|
|
Job # 5-547 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-094R |
Tab |
Mowing |
Mar 28, 2012 |
Izard & Independence Counties |
KR |
4/10/2012 |
|
|
|
|
Specifications |
|
|
|
Job # 5-546 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-093R |
Tab |
Mowing |
Mar 28, 2012 |
White & Cleburne Counties |
KR |
4/10/2012 |
|
|
|
|
Specifications |
|
|
|
Job # 5-545 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-092R |
Tab |
Mowing |
Mar 28, 2012 |
Cleburne & White Counties |
KR |
5/3/2012 |
|
|
|
|
Specifications |
|
|
|
Job # 5-544 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-091R |
Tab |
Mowing |
Mar 28, 2012 |
Crawford & Franklin Counties |
KR |
AWARD |
|
|
|
|
Specifications |
|
|
|
Job # 4-763 |
|
RESCINDED |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-090R |
Tab |
Mowing |
Mar 28, 2012 |
Crawford & Sebastian Counties |
KR |
4/10/2012 |
|
|
|
|
Specifications |
|
|
|
Job # 4-762 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-089R |
Tab |
Mowing |
Mar 28, 2012 |
Jefferson County |
KR |
4/10/2012 |
|
|
|
|
Specifications |
|
|
|
Job # 2-582 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-088R |
Tab |
Mowing |
Mar 28, 2012 |
Grant & Jefferson Counties |
KR |
4/10/2012 |
|
|
|
|
Specifications |
|
|
|
Job # 2-581 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-087R |
Tab |
Mowing |
Mar 28, 2012 |
Jefferson County |
KR |
4/10/2012 |
|
|
|
|
Specifications |
|
|
|
Job # 2-580 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-086R |
Tab |
Mowing |
Mar 28, 2012 |
Grant County |
KR |
4/10/2012 |
|
|
|
|
Specifications |
|
|
|
Job # 2-579 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-085R |
Tab |
Mowing |
Mar 28, 2012 |
Arkansas, Jefferson & Prairie |
KR |
4/10/2012 |
|
|
|
|
Specifications |
|
|
|
Counties |
|
|
|
|
|
|
|
|
|
|
Job # 2-578 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-084R |
Tab |
Mowing |
Mar 28, 2012 |
Ashley & Drew Counties |
KR |
4/10/2012 |
|
|
|
|
Specifications |
|
|
|
Job # 2-577 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-083R |
Tab |
Mowing |
Mar 28, 2012 |
Arkansas County |
KR |
4/10/2012 |
|
|
|
|
Specifications |
|
|
|
Job # 2-576 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-082R |
Tab |
Mowing |
Mar 28, 2012 |
Jefferson & Lincoln Counties |
KR |
4/10/2012 |
|
|
|
|
Specifications |
|
|
|
Job # 2-575 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-081R |
Tab |
Mowing |
Mar 28, 2012 |
Drew County |
KR |
4/10/2012 |
|
|
|
|
Specifications |
|
|
|
Job # 2-574 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-080R |
Tab |
Mowing |
Mar 28, 2012 |
Desha & Drew Counties |
KR |
4/10/2012 |
|
|
|
|
Specifications |
|
|
|
Job # 2-573 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-079R |
Tab |
Mowing |
Mar 28, 2012 |
Chicot County |
KR |
4/10/2012 |
|
|
|
|
Specifications |
|
|
|
Job # 2-572 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-078R |
Tab |
Mowing |
Mar 28, 2012 |
Chicot County |
KR |
4/10/2012 |
|
|
|
|
Specifications |
|
|
|
Job # 2-571 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-077R |
Tab |
Mowing |
Mar 28, 2012 |
St. Francis & Crittenden Counties |
KR |
4/10/2012 |
|
|
|
|
Specifications |
|
|
|
Job # 11-546 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-076R |
Tab |
Mowing |
Mar 28, 2012 |
Cross, Woodruff & Monroe Counties |
KR |
4/10/2012 |
|
|
|
|
Specifications |
|
|
|
Job # 11-545 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-075R |
Tab |
Mowing |
Mar 28, 2012 |
Monroe & St. Francis Counties |
KR |
4/10/2012 |
|
|
|
|
Specifications |
|
|
|
Job # 11-544 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-074R |
Tab |
Mowing |
Mar 28, 2012 |
Monroe & Lee Counties |
KR |
4/10/2012 |
|
|
|
|
Specifications |
|
|
|
Job # 11-543 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-073R |
Tab |
Mowing |
Mar 28, 2012 |
Phillips & Monroe Counties |
KR |
4/10/2012 |
|
|
|
|
Specifications |
|
|
|
Job # 11-542 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-072R |
Tab |
Mowing |
Mar 28, 2012 |
Woodruff, Cross & Crittenden |
KR |
4/10/2012 |
|
|
|
|
Specifications |
|
|
|
Counties |
|
|
|
|
|
|
|
|
|
|
Job # 11-541 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-071R |
Tab |
Mowing |
Mar 28, 2012 |
Phillips, Lee, St. Francis & |
KR |
4/10/2012 |
|
|
|
|
Specifications |
|
|
|
Cross Counties |
|
|
|
|
|
|
|
|
|
|
Job # 11-540 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-12-069A |
Tab |
|
Mar 27, 2012 |
3 Items - Mineral Aggregate Class 4 |
GPA |
3/27/2012 |
|
|
|
|
|
|
|
|
FOB: Crittenden, Cross & Woodruff Co. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-12-068P |
Tab |
|
Mar 27, 2012 |
2 Items - Aluminum Blanks |
CP |
3/27/2012 |
|
|
|
|
|
|
|
|
FOB: Little Rock, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-12-067P |
Tab |
|
Mar 27, 2012 |
11 Items - Aluminum Sign Blanks |
CP |
3/28/2012 |
|
|
|
|
|
|
|
|
FOB: Little Rock, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-12-066P |
Tab |
|
Mar 27, 2012 |
2 Items - Steel I-Beam |
CP |
3/27/2012 |
|
|
|
|
|
|
|
|
FOB: Little Rock, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-12-065P |
Tab |
|
Mar 20, 2012 |
Field Survey Systems |
CP |
3/28/2012 |
|
|
|
|
|
|
|
|
FOB: Little Rock, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-070P |
Tab |
|
Mar 20, 2012 |
Supply Contract for furnishing Fast Dry |
CP |
3/28/2012 |
|
|
|
|
|
|
|
|
Acrylic Waterborne Traffic Marking |
|
|
|
|
|
|
|
|
|
|
Paint from April 1, 2012 thru |
|
|
|
|
|
|
|
|
|
|
September 30, 2012. |
|
|
|
|
|
|
|
|
|
|
FOB: Little Rock, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-069R |
Tab |
|
Mar 20, 2012 |
Cab & Chassis |
KR |
4/11/2012 |
|
|
|
|
|
|
|
|
FOB: Paragould,
Russellville and |
|
|
|
|
|
|
Addendum |
|
|
|
Little Rock, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-12-064P |
Tab |
|
Mar 13, 2012 |
Sale of Salvage |
CP |
3/14/2012 |
|
|
|
|
|
|
|
|
FOB: Batesville, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-068P |
Tab |
|
Mar 13, 2012 |
Supply Contract for furnishing Rainwear |
CP |
5/7/2012 |
|
|
|
|
|
|
|
|
from Date of Award thru June 30, 2013. |
|
|
|
|
|
|
|
|
|
|
FOB: Little Rock, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-067R |
Tab |
|
Mar 6, 2012 |
Cab & Chassis, 16,000 lbs. GVWR, |
KR |
3/19/2012 |
|
|
|
|
Addendum |
|
|
|
Diesel, 60" CA, With Service Body |
|
|
|
|
|
|
Addendum (2) |
|
|
EXTENDED TO: |
and Electric Powered Crane |
|
|
|
|
|
|
|
|
|
Mar 13, 2012 |
FOB: Little Rock, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-066R |
Tab |
|
Mar 6, 2012 |
Crew Cab & Chassis, 1 Ton, 60" CA, |
KR |
3/19/2012 |
|
|
|
|
Addendum |
|
|
|
With Flatbed Body |
|
|
|
|
|
|
|
|
|
|
FOB: Little Rock, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-12-063A |
Tab |
|
Mar 6, 2012 |
7 Items - Mineral Aggregate Class 2 |
GPA |
3/12/2012 |
|
|
|
|
|
|
|
|
FOB: Prairie, Lonoke,
Pulaski, |
|
|
|
|
|
|
|
|
|
|
Saline & Hot Springs Co. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-065A |
Tab |
|
Feb 28, 2012 |
Supply Contract for furnishing Genuine |
GPA |
3/12/2012 |
|
|
|
|
|
|
|
|
Terrain King and Bushwacker Mower |
|
|
|
|
|
|
|
|
|
|
Parts from 4/1/2012 Thru 3/31/2013. |
|
|
|
|
|
|
|
|
|
|
FOB: Statewide |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-064A |
Tab |
|
Feb 28, 2012 |
Supply Contract for furnishing Asphalt |
GPA |
3/12/2012 |
|
|
|
|
|
|
|
|
Concrete Cold Plant And Hot Mix |
|
|
|
|
|
|
|
|
|
|
Materials from 4/1/2012 Thru 6/30/2012 |
|
|
|
|
|
|
|
|
|
|
FOB: Statewide |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-063A |
Tab |
|
Feb 28, 2012 |
Supply Contract for furnishing Liquid |
GPA |
3/12/2012 |
|
|
|
|
|
|
|
|
Asphalt Materials from 4/1/2012 |
|
|
|
|
|
|
|
|
|
|
thru 6/30/2012. |
|
|
|
|
|
|
|
|
|
|
FOB: Statewide |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-062A |
Tab |
|
Feb 28, 2012 |
Supply Contract For Furnishing Mineral |
GPA |
3/12/2012 |
|
|
|
|
|
|
|
|
Aggregate, Crushed Stone & Gravel Of |
|
|
|
|
|
|
|
|
|
|
Various Classes from 4/1/2012 thru |
|
|
|
|
|
|
|
|
|
|
6/30/2012. |
|
|
|
|
|
|
|
|
|
|
FOB: Statewide |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-061R |
Tab |
|
Feb 28, 2012 |
3/4 Ton Pickups, Vans and Cab & |
KR |
3/19/2012 |
|
|
|
|
|
|
|
|
Chassis |
|
|
|
|
|
|
|
|
|
|
FOB: Statewide |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-12-062A |
Tab |
|
Feb 22, 2012 |
6 Items - Mineral Aggregate Class 1 |
GPA |
3/2/2012 |
|
|
|
|
|
|
|
|
FOB: Fulton, Independence, Izard, |
|
|
|
|
|
|
|
|
|
|
Jackson & Stone Co. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-060R |
Tab |
|
Feb 22, 2012 |
1/2 Ton Pickups and Vans |
KR |
3/2/2012 |
|
|
|
|
|
|
|
|
FOB: Statewide |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-12-061A |
Tab |
|
Feb 22, 2012 |
8 Items - Mineral Aggregate Class 2 |
GPA |
3/2/2012 |
|
|
|
|
|
|
|
|
FOB:Baxter, Benton, Carroll, Madison, |
|
|
|
|
|
|
|
|
|
|
Marion, Newton & Searcy Co. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-12-060A |
Tab |
|
Feb 14, 2012 |
1 Item - Mineral Aggregate Class 1 |
GPA |
2/22/2012 |
|
|
|
|
|
|
|
|
FOB: Columbia Co. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-12-059A |
Tab |
|
Feb 14, 2012 |
4 Items Mineral Aggregate Class 1 |
GPA |
2/23/2012 |
|
|
|
|
|
|
|
|
FOB: Hempstead, Lafayette & |
|
|
|
|
|
|
|
|
|
|
Miller Co. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-12-058A |
Tab |
|
Feb 14, 2012 |
7 Items - Mineral Aggregate Class 4 |
GPA |
2/22/2012 |
|
|
|
|
|
|
|
|
FOB: Mississippi, Poinset, Randolph & |
|
|
|
|
|
|
|
|
|
|
Lawrence Co. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-12-057A |
Tab |
|
Feb 14, 2012 |
7 Items - Mineral Aggregate Class 4 |
GPA |
2/22/2012 |
|
|
|
|
|
|
|
|
FOB:Clay, Craighead, Greene & |
|
|
|
|
|
|
|
|
|
|
Lawrence Co. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-12-056A |
Tab |
|
Feb 14, 2012 |
8 Items - Mineral Aggregate Class 2 |
GPA |
2/23/2012 |
|
|
|
|
|
|
|
|
FOB: Conway, Faulkner, Johnson, |
|
|
|
|
|
|
|
|
|
|
Montgomery, Perry, Pope, Van Buren & |
|
|
|
|
|
|
|
|
|
|
Yell Co. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-12-055P |
Tab |
|
Feb 7, 2012 |
Asbestos Abatement and Demolition |
CP |
2/13/2012 |
|
|
|
|
|
|
|
|
FOB: Washington County |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-12-054P |
Tab |
|
Feb 7, 2012 |
8 Items - Service Pins |
CP |
2/13/2012 |
|
|
|
|
|
|
|
|
FOB: Little Rock, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-12-053P |
Tab |
|
Feb 7, 2012 |
Asbestos Abatement and Demolition |
CP |
2/13/2012 |
|
|
|
|
|
|
|
|
FOB: Mississippi County |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-059R |
Tab |
|
Jan 31, 2012 |
Sedans and Carryall |
KR |
2/10/2012 |
|
|
|
|
|
|
|
|
FOB: Little Rock, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-12-052A |
Tab |
|
Jan 31, 2012 |
2 Items - Mineral Aggregate Class 1 SP |
GPA |
2/10/2012 |
|
|
|
|
|
|
|
|
FOB: Nevada & Pike
Co. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-12-051A |
Tab |
|
Jan 24, 2012 |
1 Item - Mineral Aggregate Class 4 |
GPA |
1/26/2012 |
|
|
|
|
|
|
|
|
FOB: St. Francis Co. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-12-050A |
Tab |
|
Jan 24, 2012 |
3 Items - Mineral Aggregate Class 1 |
GPA |
1/31/2012 |
|
|
|
|
|
|
|
|
FOB: Clark & Columbia Co. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-12-049A |
Tab |
|
Jan 24, 2012 |
7 Items - Class 1 Mineral Aggregate |
GPA |
1/31/2012 |
|
|
|
|
|
|
|
|
FOB: Hempstead, Howard, Lafayette, |
|
|
|
|
|
|
|
|
|
|
little River, Miller & Sevier Co. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-12-048A |
Tab |
|
Jan 24, 2012 |
7 Items- Class 4 Mineral Aggregate |
GPA |
1/31/2012 |
|
|
|
|
|
|
|
|
FOB: Woodruff, Monroe, Phillips, Lee & |
|
|
|
|
|
|
|
|
|
|
St. Francis Co. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-12-047A |
Tab |
|
Jan 24, 2012 |
7 Items- Class 4 Mineral Aggregate |
GPA |
1/31/2012 |
|
|
|
|
|
|
|
|
FOB: St. Francis, Crittenden, Cross & |
|
|
|
|
|
|
|
|
|
|
Woodruff Co. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-058A |
Tab |
|
Jan 17, 2012 |
Articulated Motor Grader |
CP |
1/20/2012 |
|
|
|
|
|
|
|
|
FOB: Camden, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
RFP |
|
|
Jan 17, 2012 |
Request to secure Bond Counsel |
CP |
|
|
|
|
|
|
|
|
4:30 p.m. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-12-046R |
Tab |
|
Jan. 10, 2012 |
Truck Mounted Paint Striping Machine |
KR |
1/20/2012 |
|
|
|
|
|
|
|
|
FOB: Little Rock, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-12-045P |
Tab |
|
Jan. 3, 2012 |
Aluminum Blanks |
CP |
1/9/2012 |
|
|
|
|
|
|
|
|
FOB: Little Rock, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-12-044P |
Tab |
|
Jan. 3, 2012 |
Aluminum Sign Blanks |
CP |
1/9/2012 |
|
|
|
|
|
|
|
|
FOB: Little Rock, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-12-043P |
Tab |
|
Jan. 3, 2012 |
Aluminum Sign Blanks |
CP |
1/9/2012 |
|
|
|
|
|
|
|
|
FOB: Little Rock, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-057A |
Tab |
|
Dec 20, 2011 |
Four Wheel Type Pickup Street Sweeper |
GPA |
1/9/2012 |
|
|
|
|
|
|
|
|
FOB: Ft. Smith, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
RFQ-12-005P |
|
|
Dec 19, 2011 |
Outside Legal Counsel - Securities |
CP |
|
|
|
|
|
Addendum |
|
|
4:30 p.m. |
Litigation and Advice; Asset Recovery |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-056A |
Tab |
|
Dec 13, 2011 |
Three Axle Hydralic Tail Low Bed Trailer, |
GPA |
12/20/2011 |
|
|
|
|
|
|
|
|
With Front Axle Lift Kit. |
|
|
|
|
|
|
|
|
|
|
FOB: Little Rock, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-055A |
Tab |
|
Dec 13, 2011 |
Truck Mounted Bituminous Distributor, |
GPA |
12/20/2011 |
|
|
|
|
|
|
|
|
With Computerized Automatic |
|
|
|
|
|
|
|
|
|
|
Application Rate Control System. |
|
|
|
|
|
|
|
|
|
|
FOB: Camden, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-054A |
Tab |
|
Dec 13, 2011 |
Trailer Mounted Bitumen Machine. |
GPA |
12/14/2011 |
|
|
|
|
|
|
|
|
FOB: Wynne, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-053A |
Tab |
|
Dec 13, 2011 |
4 - 6 Ton Portable
Tandem Static Roller |
GPA |
12/20/2011 |
|
|
|
|
|
|
|
|
FOB: Pine Bluff, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-052A |
Tab |
|
Dec 13, 2011 |
Self Propelled Two Way Sweeper, With |
GPA |
12/20/2011 |
|
|
|
|
|
|
|
|
Sprinkler System. |
|
|
|
|
|
|
|
|
|
|
FOB: Pine Bluff &
Camden AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-051A |
Tab |
|
Dec 13, 2011 |
Heavy Duty Rear Mount Rotary Mower, |
GPA |
12/14/2011 |
|
|
|
|
|
|
|
|
5' Cutting Width With 3 Point Hitch. |
|
|
|
|
|
|
|
|
|
|
FOB: Russellville, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-050A |
Tab |
|
Dec 13, 2011 |
Pull Type Rotary Mower, 15' Cuting |
GPA |
12/20/2011 |
|
|
|
|
|
|
|
|
Width With Standard Drive Line And |
|
|
|
|
|
|
|
|
|
|
Foam Filled Tires. |
|
|
|
|
|
|
|
|
|
|
FOB: Hope &
Paragould AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-12-042P |
Tab |
|
Dec 6, 2011 |
400 KW Diesel Generator |
CP |
12/14/2011 |
|
|
|
|
|
|
|
|
FOB: Little Rock, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-049A |
Tab |
|
Dec 6, 2011 |
Hydraulic Excavator, Track Mounted |
GPA |
12/14/2011 |
|
|
|
|
|
|
|
|
With Mechanical Thumb, 42" Excavating |
|
|
|
|
|
|
|
|
|
|
Bucket And 60" Ditching Bucket. |
|
|
|
|
|
|
|
|
|
|
FOB: Wynne, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-048A |
Tab |
|
Dec 6, 2011 |
Skid Steer Loader, 70 Net HP, Four |
GPA |
12/14/2011 |
|
|
|
|
|
|
|
|
Wheel Drive, 2,500 Pound Operating |
|
|
|
|
|
|
|
|
|
|
Capacity With Material Bucket And 60" |
|
|
|
|
|
|
|
|
|
|
Angle Broom Attachment. |
|
|
|
|
|
|
|
|
|
|
FOB: Ft. Smith, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-047A |
Tab |
|
Dec 6, 2011 |
Skid Steer Loader, 70 Net HP, Four |
GPA |
12/14/2011 |
|
|
|
|
|
|
|
|
Wheel Drive, 2,500 Pound Operating |
|
|
|
|
|
|
|
|
|
|
Capacity With Material Bucket. |
|
|
|
|
|
|
|
|
|
|
FOB: Russellville, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-046A |
Tab |
|
Dec 6, 2011 |
Four Wheel Drive Front End Loader, 2.5 |
GPA |
12/14/2011 |
|
|
|
|
|
|
|
|
Cubic Yard Capacity. |
|
|
|
|
|
|
|
|
|
|
FOB: Little Rock &
Paragould AR. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-045P |
Tab |
|
Dec 6, 2011 |
Supply Contract for furnishing |
CP |
12/14/2011 |
|
|
|
|
|
|
|
|
Thermoplastic Pavement Marking |
|
|
|
|
|
|
|
|
|
|
Material from January 1, 2012 thru |
|
|
|
|
|
|
|
|
|
|
December 31, 2012. |
|
|
|
|
|
|
|
|
|
|
FOB: Little Rock, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-044P |
Tab |
|
Dec 6, 2011 |
Supply Contract for furnishing Traffic |
CP |
12/14/2011 |
|
|
|
|
|
|
|
|
Cones from Janaury 1, 2012 thru |
|
|
|
|
|
|
|
|
|
|
December 31, 2012. |
|
|
|
|
|
|
|
|
|
|
FOB: Statewide |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-043P |
Tab |
|
Nov 29, 2011 |
Supply Contract for furnishing Guide |
CP |
12/9/2011 |
|
|
|
|
|
|
|
|
Signs from January 1, 2012 thru |
|
|
|
|
|
|
|
|
|
|
December 31, 2012. |
|
|
|
|
|
|
|
|
|
|
FOB: Little Rock, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-042P |
Tab |
|
Nov 29, 2011 |
Supply Contract for furnishing Raised |
CP |
12/9/2011 |
|
|
|
|
|
|
|
|
Pavement Markers from January 1, 2012 |
|
|
|
|
|
|
|
|
|
|
thru December 31, 2012. |
|
|
|
|
|
|
|
|
|
|
FOB: Statewide |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-041P |
Tab |
|
Nov 29, 2011 |
Contract for furnishing Concrete |
CP |
12/9/2011 |
|
|
|
|
|
|
|
|
Pavement Leveling Undersealing and |
|
|
|
|
|
|
|
|
|
|
Stabilizing |
|
|
|
|
|
|
|
|
|
|
FOB: Statewide |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-12-041P |
Tab |
|
Nov 29, 2011 |
Asbestos Abatement and Demolition |
CP |
12/9/2011 |
|
|
|
|
|
|
|
|
FOB: Phillips County |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-040P |
Tab |
|
Nov 29, 2011 |
Supply Contract for furnishing Fast Dry |
CP |
12/14/2011 |
|
|
|
|
|
|
|
|
Acrylic Waterborne Traffic Marking |
|
|
|
|
|
|
Addendum |
|
|
|
Paint (White & Yellow) from |
|
|
|
|
|
|
|
|
|
|
January 1, 2012 thru March 31, 2012 |
|
|
|
|
|
|
|
|
|
|
FOB: Little Rock, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-039P |
Tab |
|
Nov 29, 2011 |
Contract for Sale of Scrap Aluminum |
CP |
12/9/2011 |
|
|
|
|
|
|
|
|
and Steel from January 1, 2012 thru |
|
|
|
|
|
|
|
|
|
|
December 31, 2012. |
|
|
|
|
|
|
|
|
|
|
FOB: Pine Bluff, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-038A |
Tab |
|
Nov 29, 2011 |
Wheel Tractor, 85 PTO HP, FWD |
GPA |
12/9/2011 |
|
|
|
|
|
|
|
|
FOB: Russellville, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-037A |
Tab |
|
Nov 29, 2011 |
Wheel Tractor, 75 PTO HP, FWD |
GPA |
12/9/2011 |
|
|
|
|
|
|
|
|
FOB: Batesville, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-036A |
Tab |
|
Nov 29, 2011 |
Wheel Tractor, 75 PTO HP, FWD |
GPA |
12/9/2011 |
|
|
|
|
|
|
|
|
FOB: Hope, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-035A |
Tab |
|
Nov 29, 2011 |
Low Profile Wheel Tractor, 55 PTO HP |
GPA |
12/9/2011 |
|
|
|
|
|
|
|
|
FOB: Ft. Smith, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-034A |
Tab |
|
Nov 29, 2011 |
Wheel Tractor, 55 PTO HP |
GPA |
12/9/2011 |
|
|
|
|
|
|
|
|
FOB: Batesville, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-033A |
Tab |
|
Nov 29, 2011 |
Wheel Tractor, 55 PTO HP |
GPA |
12/9/2011 |
|
|
|
|
|
|
|
|
FOB: Wynne, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-032A |
Tab |
|
Nov 29, 2011 |
Backhoe/Loader, FWD, 97 Net HP |
GPA |
12/9/2011 |
|
|
|
|
|
|
|
|
FOB: Ft. Smith, AR |
|
|
|
|
|
|
Addendum |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-031A |
Tab |
|
Nov 15, 2011 |
Supply Contract for furnishing Corrugated |
GPA |
12/9/2011 |
|
|
|
|
|
|
|
|
Pipe Culvert from January 1, 2012 thru |
|
|
|
|
|
|
|
|
|
|
June 30, 2012. |
|
|
|
|
|
|
|
|
|
|
FOB: Statewide |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-030A |
Tab |
|
Nov 15, 2011 |
Supply Contract for furnishing Liquid |
GPA |
12/9/2011 |
|
|
|
|
|
|
|
|
Asphalt Materials from January 1, 2012 |
|
|
|
|
|
|
|
|
|
|
thru March 31, 2012. |
|
|
|
|
|
|
|
|
|
|
FOB: Statewide |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-029A |
Tab |
|
Nov 15, 2011 |
Supply Contract for furnishing Asphalt |
GPA |
12/9/2011 |
|
|
|
|
|
|
|
|
Concrete Cold Plant and Hot Mix |
|
|
|
|
|
|
|
|
|
|
Materials from January 1, 2012 thru |
|
|
|
|
|
|
|
|
|
|
March 31, 2012. |
|
|
|
|
|
|
|
|
|
|
FOB: Statewide |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-028A |
Tab |
|
Nov 15, 2011 |
Supply Contract for furnishing Mineral |
GPA |
12/9/2011 |
|
|
|
|
|
|
|
|
Aggregate, Crushed Stone and Gravel |
|
|
|
|
|
|
|
|
|
|
of various classes from January 1, 2012 |
|
|
|
|
|
|
|
|
|
|
thru March 31, 2012. |
|
|
|
|
|
|
|
|
|
|
FOB: Statewide |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-12-040P |
Tab |
|
Nov 15, 2011 |
Winter Style Soft Cap |
CP |
12/12/2011 |
|
|
|
|
|
|
|
|
FOB: Little Rock, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-027A |
Tab |
|
Nov 1, 2011 |
Supply Contract for furnishing Vegatation |
GPA |
12/9/2011 |
|
|
|
|
|
|
|
|
Control Chemicals from December |
|
|
|
|
|
|
|
|
|
|
1, 2011 thru November 30, 2012. |
|
|
|
|
|
|
|
|
|
|
FOB: Statewide |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-12-039A |
Tab |
|
Nov 1, 2011 |
10' Snow Plow Attachment w/Electric |
GPA |
11/9/2011 |
|
|
|
|
|
|
|
|
Hyd.Pump, 36" Moldboard Height |
|
|
|
|
|
|
|
|
|
|
FOB: Pine Bluff, Camden & |
|
|
|
|
|
|
|
|
|
|
Paragould, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-12-038A |
Tab |
|
Nov 1, 2011 |
10' Snow Plow Attachment w/o Truck |
GPA |
11/7/2011 |
|
|
|
|
|
|
|
|
Hitch, With Electric Hyd. Pump, 36" |
|
|
|
|
|
|
|
|
|
|
Moldboard Height |
|
|
|
|
|
|
|
|
|
|
FOB: Wynne, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-026P |
Tab |
|
Oct 26, 2011 |
Contract for furnishing Janitorial and |
CP |
11/21/2011 |
|
|
|
|
|
|
|
|
Cleaning Services from Date of Award |
|
|
|
|
|
|
|
|
|
|
thru October 31, 2012. |
|
|
|
|
|
|
|
|
|
|
FOB: Pine Bluff, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-12-037P |
Tab |
|
Oct 26, 2011 |
Asbestos Abatement and Demolition |
CP |
11/3/2011 |
|
|
|
|
|
|
|
|
FOB: Craighead County |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-12-036A |
Tab |
|
Oct 18, 2011 |
6 Items - Schwarze Sweeper Parts |
GPA |
10/26/2011 |
|
|
|
|
|
|
|
|
FOB: Russellville, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-12-035A |
Tab |
|
Oct 18, 2011 |
1 Item - Rubber Tract Asphalt Paver |
GPA |
10/26/2011 |
|
|
|
|
|
|
|
|
FOB: Batesville, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-12-034A |
|
|
Oct 11, 2011 |
4 Items - Schwarze Sweeper Parts |
GPA |
|
|
|
|
|
Addendum |
|
|
CANCELLED |
FOB: Russellville, AR |
|
|
|
|
|
|
|
|
|
PRIOR |
|
|
|
|
|
|
|
|
|
|
TO BID |
|
|
|
|
|
|
|
|
|
|
OPENING. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-12-033P |
Tab |
|
Oct 4, 2011 |
Asbestos Abatement and Demolition |
CP |
10/19/2011 |
|
|
|
|
|
|
|
|
FOB: Drew County |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
RFP |
|
|
Responses |
Financial Advisors |
CP |
|
|
|
|
|
|
|
|
must be received |
|
|
|
|
|
|
|
|
|
|
no later than |
|
|
|
|
|
|
|
|
|
|
4:30 p.m. (CDT) |
|
|
|
|
|
|
|
|
|
|
on Monday, |
|
|
|
|
|
|
|
|
|
|
October 3, 2011. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-025P |
Tab |
Mowing |
Sep 28, 2011 |
Polk, Scott, Logan, Sebastian & |
CP |
10/11/2011 |
|
|
|
|
Specifications |
|
|
|
Franklin Counties |
|
|
|
|
|
|
|
|
|
|
Job #: 4-761 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-024H |
Tab |
Mowing |
Sep 27, 2011 |
Lafayette & Miller Counties |
MH |
10/11/2011 |
|
|
|
|
Specifications |
|
|
|
Job #: 3-796 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-023H |
Tab |
Mowing |
Sep 27, 2011 |
Miller & Little River Counties |
MH |
10/11/2011 |
|
|
|
|
Specifications |
|
|
|
Job #: 3-795 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-022H |
Tab |
Mowing |
Sep 27, 2011 |
Miller County |
MH |
10/11/2011 |
|
|
|
|
Specifications |
|
|
|
Job #: 3-794 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-021H |
Tab |
Mowing |
Sep 27, 2011 |
Garland & Hot Spring Counties |
MH |
10/11/2011 |
|
|
|
|
Specifications |
|
|
|
Job #: 6-548 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-020H |
Tab |
Mowing |
Sep 27, 2011 |
Little River & Sevier Counties |
MH |
10/11/2011 |
|
|
|
|
Specifications |
|
|
|
Job #: 3-793 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-12-032P |
Tab |
|
Sep 27, 2011 |
Sale of Salvage |
CP |
No Bids |
|
|
|
|
|
|
|
|
FOB: Batesville, AR |
|
Rec'd |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-12-031A |
Tab |
|
Sep 27, 2011 |
10' Snow Plow Attachment w/o Truck |
GPA |
Rejected |
|
|
|
|
|
|
|
|
Hitch, With electric Hyd. Pump, 36" |
|
Re-Advertise |
|
|
|
|
|
|
|
|
Moldboard Height. |
|
|
|
|
|
|
|
|
|
|
FOB: Wynne, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-12-030A |
Tab |
|
Sep 27, 2011 |
Hyd. Driven Chemical & Material |
GPA |
10/11/2011 |
|
|
|
|
|
|
|
|
Spreader, 4.5 C.Y. Capacity With Top |
|
|
|
|
|
|
Addendum |
|
|
|
Screen |
|
|
|
|
|
|
|
|
|
|
FOB: Hope & Camden,
AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-12-029A |
Tab |
|
Sep 27, 2011 |
Hyd. Driven Chemical & Material |
GPA |
10/11/2011 |
|
|
|
|
|
|
|
|
Spreader With Liquid Calcium Chloride |
|
|
|
|
|
|
|
|
|
|
Spray System, 4.5 C.Y. Capacity |
|
|
|
|
|
|
|
|
|
|
W/O Top Screen. |
|
|
|
|
|
|
|
|
|
|
FOB: Little Rock &
Paragould AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-12-028A |
Tab |
|
Sep 27, 2011 |
Hyd. Driven Chemical & Material |
GPA |
9/29/2011 |
|
|
|
|
|
|
|
|
Spreader, 7.5 C.Y. Capacity With Top |
|
|
|
|
|
|
Addendum |
|
|
|
Screen |
|
|
|
|
|
|
|
|
|
|
FOB: Pine Bluff, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-12-027A |
Tab |
|
Sep 27, 2011 |
Hyd. Driven Chemical & Material |
GPA |
9/29/2011 |
|
|
|
|
|
|
|
|
Spreader, 7.5 C.Y.
Capacity W/O Top |
|
|
|
|
|
|
Addendum |
|
|
|
Screen |
|
|
|
|
|
|
|
|
|
|
FOB: Little Rock, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-12-026A |
Tab |
|
Sep 27, 2011 |
Hyd. Driven Chemical & Material |
GPA |
10/11/2011 |
|
|
|
|
|
|
|
|
Spreader With Liquid Calcium Chloride |
|
|
|
|
|
|
|
|
|
|
Spray System, 7.5 C.Y. Capacity |
|
|
|
|
|
|
|
|
|
|
W/O Top Screen. |
|
|
|
|
|
|
|
|
|
|
FOB: Wynne &
Paragould AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-12-025A |
Tab |
|
Sep 27, 2011 |
Hyd. Driven Chemical & Material |
GPA |
9/29/2011 |
|
|
|
|
|
|
|
|
Spreader With Liquid Calcium Chloride |
|
|
|
|
|
|
|
|
|
|
Spray System, 7.5 C.Y. Capacity, With |
|
|
|
|
|
|
|
|
|
|
Top Screen. |
|
|
|
|
|
|
|
|
|
|
FOB: Harrison, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-12-024A |
Tab |
|
Sep 27, 2011 |
10' Snow Plow Attachment w/Electric |
GPA |
Rejected |
|
|
|
|
|
|
|
|
Hyd.Pump, 36" Moldboard Height. |
|
Re-Advertise |
|
|
|
|
|
|
|
|
FOB: Pine Bluff, Camden & |
|
|
|
|
|
|
|
|
|
|
Paragould, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-12-023A |
Tab |
|
Sep 20, 2011 |
1 Item - General Purpose Epoxy, Parts |
GPA |
9/29/2011 |
|
|
|
|
|
|
|
|
A & B |
|
|
|
|
|
|
|
|
|
|
FOB: Little Rock, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-12-022A |
Tab |
|
Sep 20, 2011 |
1 Item - Calcium Sulfonate Bridge Paint |
GPA |
9/21/2011 |
|
|
|
|
|
|
|
|
FOB: Little Rock, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-12-021P |
Tab |
|
Sep 20, 2011 |
Sale of Salvage |
CP |
9/21/2011 |
|
|
|
|
|
|
|
|
FOB: Wynne, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-019A |
Tab |
|
Sep 14, 2011 |
Supply Contract For furnishing Asphalt |
GPA |
9/29/2011 |
|
|
|
|
|
|
|
|
Concrete Cold Plant And Hot Mix |
|
|
|
|
|
|
|
|
|
|
Materials from October 1, 2011 thru |
|
|
|
|
|
|
|
|
|
|
31-Dec-11 |
|
|
|
|
|
|
|
|
|
|
FOB: Statewide |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-018A |
Tab |
|
Sep 14, 2011 |
Supply Contract For furnishing Mineral |
GPA |
9/29/2011 |
|
|
|
|
|
|
|
|
Aggregate, Crushed Stone & Gravel Of |
|
|
|
|
|
|
|
|
|
|
Various Classes from October 1, 2011 |
|
|
|
|
|
|
|
|
|
|
thru December 31, 2011 |
|
|
|
|
|
|
|
|
|
|
FOB: Statewide |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-017A |
Tab |
|
Sep 14, 2011 |
Supply Contract For furnishing Liquid |
GPA |
9/29/2011 |
|
|
|
|
|
|
|
|
Asphalt Materials from October 1, 2011 |
|
|
|
|
|
|
|
|
|
|
thru December 31, 2011 |
|
|
|
|
|
|
|
|
|
|
FOB: Statewide |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-12-019P |
Tab |
|
Sep 13, 2011 |
Sale of Salvage and Used Tires |
CP |
9/14/2011 |
|
|
|
|
|
|
|
|
FOB: Harrison, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-016A |
Tab |
|
Sep 13, 2011 |
Supply Contract for furnishing Snow and |
GPA |
9/29/2011 |
|
|
|
|
|
|
|
|
Ice Control Materials from October 1, |
|
|
|
|
|
|
|
|
|
|
2011 thru March 31, 2012. |
|
|
|
|
|
|
|
|
|
|
FOB: Statewide |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-015A |
Tab |
|
Sep 13, 2011 |
Supply Contract for furnishing Liquid |
GPA |
9/29/2011 |
|
|
|
|
|
|
|
|
Magnesium Chloride (w/o corrosion |
|
|
|
|
|
|
|
|
|
|
inhibited liquids) from October 1, 2011 |
|
|
|
|
|
|
|
|
|
|
thru March 31, 2012. |
|
|
|
|
|
|
|
|
|
|
FOB: Statewide |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-014A |
Tab |
|
Sep 13, 2011 |
Supply Contract for furnishing Liquid |
GPA |
9/29/2011 |
|
|
|
|
|
|
|
|
Calcium Chloride (w/o corrosion |
|
|
|
|
|
|
|
|
|
|
inhibited liquids) from October 1, 2011 |
|
|
|
|
|
|
|
|
|
|
thru March 31, 2012. |
|
|
|
|
|
|
|
|
|
|
FOB: Statewide |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-013A |
Tab |
|
Sep 13, 2011 |
Supply Contract for furnishing Liquid |
GPA |
9/29/2011 |
|
|
|
|
|
|
|
|
Magnesium Chloride (corrosion |
|
|
|
|
|
|
|
|
|
|
inhibited liquids) from October 1, 2011 |
|
|
|
|
|
|
|
|
|
|
thru March 31, 2012. |
|
|
|
|
|
|
|
|
|
|
FOB: Statewide |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-12-020A |
Tab |
|
Sep 7, 2011 |
2 Items - Four Post Surface Mounted |
GPA |
9/15/2011 |
|
|
|
|
|
|
|
|
Car And Truck Lift 30,000 Pounds Cap. |
|
|
|
|
|
|
|
|
|
|
FOB: Barling, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-12-018A |
Tab |
|
Aug 30, 2011 |
Hydraulic Driven Chemical & Material |
GPA |
9/6/2011 |
|
|
|
|
|
|
|
|
Spreader |
|
|
|
|
|
|
|
|
|
|
FOB: Russellville, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-12-017P |
Tab |
|
Aug 16, 2011 |
Asbestos Abatement and Demolition |
CP |
8/19/2011 |
|
|
|
|
|
|
|
|
FOB: Mississippi County |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-12-016P |
Tab |
|
Aug 16, 2011 |
Overlay Project |
CP |
8/19/2011 |
|
|
|
|
|
|
|
|
FOB: Conway County |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-012H |
Tab |
Mowing |
Aug 16, 2011 |
Garland & Hot Spring Counties |
MH |
Rejected |
|
|
|
|
Specifications |
|
|
|
Job #: 6-548 |
|
Re-Advertise |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-011H |
Tab |
Mowing |
Aug 16, 2011 |
Little River & Sevier Counties |
MH |
Rejected |
|
|
|
|
Specifications |
|
|
|
Job #: 3-793 |
|
Re-Advertise |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-010H |
Tab |
Mowing |
Aug 16, 2011 |
Hempstead, Howard, Nevada, Pike & |
MH |
8/25/2011 |
|
|
|
|
Specifications |
|
|
|
Sevier Counties |
|
|
|
|
|
|
|
|
|
|
Job #: 3-792 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-009H |
Tab |
Mowing |
Aug 16, 2011 |
Prairie, Lonoke & Pulaski Counties |
MH |
8/25/2011 |
|
|
|
|
Specifications |
|
|
|
Job #: 6-547 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
RFP
12-003P |
|
|
Aug 15, 2011 |
Overhaul of 1979 Cessna 206 Aircraft |
CP |
|
|
|
|
|
|
|
|
1:00 p.m. |
Engine |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
RFP
12-002P |
|
|
Aug 4, 2011 |
Conducting a Public Auction of Used & |
CP |
|
|
|
|
|
|
|
|
1:00 p.m. |
Surplus Equipment |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-008P |
Tab |
|
Aug 2, 2011 |
Supply Contract for furnishing AHTD |
CP |
9/2/2011 |
|
|
|
|
|
|
|
|
Safety Vest from Date of Award |
|
|
|
|
|
|
|
|
|
|
thru June 30, 2012 |
|
|
|
|
|
|
|
|
|
|
FOB: Statewide |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-007P |
Tab |
|
Aug 2, 2011 |
Supply Contract for furnishing Adopt-A- |
CP |
9/2/2011 |
|
|
|
|
|
|
|
|
Highway Safety Vest from Date of Award |
|
|
|
|
|
|
|
|
|
|
thru June 30, 2012 |
|
|
|
|
|
|
|
|
|
|
FOB: Statewide |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-12-015P |
Tab |
|
Aug 2, 2011 |
2 Items - Winter Headwear |
CP |
8/29/2011 |
|
|
|
|
|
|
|
|
FOB: Little Rock, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-12-014P |
Tab |
|
Aug 2, 2011 |
1 Item - Summer Cap |
CP |
8/29/2011 |
|
|
|
|
|
|
|
|
FOB: Little Rock, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-12-013P |
Tab |
|
Aug 2, 2011 |
Asbestos Abatement and Demolition |
CP |
8/9/2011 |
|
|
|
|
|
|
|
|
FOB: Mississippi County |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-12-012P |
Tab |
|
Jul 26, 2011 |
3 Items - Aluminum Sign Blanks |
CP |
8/4/2011 |
|
|
|
|
|
|
|
|
FOB: Little Rock, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-12-011P |
Tab |
|
Jul 26, 2011 |
9 Items - Aluminum Sign Blanks |
CP |
8/4/2011 |
|
|
|
|
|
|
|
|
FOB: Little Rock, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-12-010P |
Tab |
|
Jul 26, 2011 |
Elastically Modified Joint & Crack |
CP |
8/4/2011 |
|
|
|
|
|
|
|
|
Sealant |
|
|
|
|
|
|
|
|
|
|
FOB: Wynne, Pine Bluff
& Fort |
|
|
|
|
|
|
|
|
|
|
Smith, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-12-009P |
Tab |
|
Jul 26, 2011 |
Self Leveling Type 2 Joint & Crack |
CP |
8/4/2011 |
|
|
|
|
|
|
|
|
Sealant |
|
|
|
|
|
|
|
|
|
|
FOB: Camden &
Harrison, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-12-008P |
Tab |
|
Jul 26, 2011 |
Self Leveling Type 1 Joint & Crack |
CP |
8/4/2011 |
|
|
|
|
|
|
|
|
Sealant |
|
|
|
|
|
|
|
|
|
|
FOB: Hope &
Batesville, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-12-007A |
Tab |
|
Jul 26, 2011 |
9 Items - Carbide Tip Snowplow Blades |
GPA |
8/4/2011 |
|
|
|
|
|
|
|
|
FOB: Ft. Smith, Camden, Russellville, |
|
|
|
|
|
|
|
|
|
|
Harrison & Paragould, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-12-006A |
Tab |
|
Jul 26, 2011 |
10 Items- Grader Blades, Snowplow |
GPA |
8/4/2011 |
|
|
|
|
|
|
|
|
Blades |
|
|
|
|
|
|
|
|
|
|
FOB: Wynne, Pine
Bluff, Ft. Smith, |
|
|
|
|
|
|
|
|
|
|
Camden, Russellville & Paragould, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-12-005A |
Tab |
|
Jul 26, 2011 |
6 Items - Tire Chains |
GPA |
8/4/2011 |
|
|
|
|
|
|
|
|
FOB: Ft. Smith,
Russellville & |
|
|
|
|
|
|
|
|
|
|
Harrison, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-12-004A |
Tab |
|
Jul 26, 2011 |
10 Items - Antifreeze |
GPA |
7/28/2011 |
|
|
|
|
|
|
|
|
FOB: Wynne, Ft. Smith,
Camden, |
|
|
|
|
|
|
|
|
|
|
Harrison & Paragould, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-12-003P |
Tab |
|
Jul 19, 2011 |
2 Items - Steel I-Beam |
CP |
7/20/2011 |
|
|
|
|
|
|
|
|
FOB: Little Rock, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
RFP
12-001P |
|
|
Jul 14, 2011 |
Overhaul of 1979 Cessna 206 Aircraft |
CP |
|
|
|
|
|
|
|
|
1:00 p.m. |
Engine |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-12-002P |
Tab |
|
Jul 12, 2011 |
HVAC Renovation |
CP |
7/21/2011 |
|
|
|
|
|
|
|
|
FOB: Pine Bluff, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-006P |
Tab |
Mowing |
Jun 28, 2011 |
Removal and Disposal of Litter and |
CP |
7/7/2011 |
|
|
|
|
|
|
|
|
Mowing and Trimming of Hwy. ROW |
|
|
|
|
|
|
Addendum |
|
|
|
Properties. |
|
|
|
|
|
|
|
|
|
|
FOB: Benton &
Washington Counties |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M-12-001P |
Tab |
|
Jun 21, 2011 |
Sale of the Peel Ferry Tug |
CP |
6/29/2011 |
|
|
|
|
|
|
|
|
FOB: Peel, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-005P |
Tab |
|
Jun 21, 2011 |
Supply Contract for furnishing Safety |
CP |
Cancelled |
|
|
|
|
|
|
|
|
Vest from Date of Award thru June 30, |
|
prior to |
|
|
|
|
Addendum |
|
|
|
2012 with an option to renew. |
|
bid opening |
|
|
|
|
|
|
|
|
FOB: Statewide |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-004P |
Tab |
|
Jun 21, 2011 |
Supply Contract for furnishing Adopt-A- |
CP |
Cancelled |
|
|
|
|
|
|
|
|
Highway Safety Vest from Date of Award |
|
prior to |
|
|
|
|
Addendum |
|
|
|
thru June 30, 2012 with an option to |
|
bid opening |
|
|
|
|
|
|
|
|
renew. |
|
|
|
|
|
|
|
|
|
|
FOB: Statewide |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-003A |
Tab |
|
Jun 14, 2011 |
Supply Contract For Furnishing Milling |
GPA |
6/21/2011 |
|
|
|
|
|
|
|
|
Machine Tools From July 1, 2011 Thru |
|
|
|
|
|
|
|
|
|
|
June 30, 2012. |
|
|
|
|
|
|
|
|
|
|
FOB: Little Rock, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-002P |
Tab |
|
Jun 14, 2011 |
Supply Contract for furnishing Fast Dry |
CP |
6/21/2011 |
|
|
|
|
|
|
|
|
Acrylic Waterborne Traffic Marking |
|
|
|
|
|
|
|
|
|
|
Paint (Yellow) from July 1, 2011 thru |
|
|
|
|
|
|
|
|
|
|
December 31, 2011. |
|
|
|
|
|
|
|
|
|
|
FOB: Little Rock, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H-12-001P |
Tab |
|
Jun 14, 2011 |
Supply Contract for furnishing Fast Dry |
CP |
6/21/2011 |
|
|
|
|
|
|
|
|
Acrylic Waterborne Traffic Marking |
|
|
|
|
|
|
|
|
|
|
Paint (White) from July 1, 2011 thru |
|
|
|
|
|
|
|
|
|
|
December 31, 2011. |
|
|
|
|
|
|
|
|
|
|
FOB: Little Rock, AR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|